6-25
DSR-80/80P/60/60P
6-16. PRECEDING ROLLER (TG-7) ASSEMBLY REPLACEMENT
Tools
Tape guide adjustment driver : J-6440-850-A
Cleaning cloth
: 3-184-527-01
Cleaning fluid
: 9-919-573-01
Removal
1. Revolve the worm gear of the gear box assembly
with hand in the direction of arrow until the
preceding roller assembly comes to the position
as shown.
2. Revolve the top flange in the direction of arrow,
and remove the top flange.
Note :
Do not revolve the fixing screws
which are painted by screw locking
compound.
3. Remove the preceding roller assembly.
4. Remove the bottom flange and the compression
coil spring.
Attachment
5. Clean the outer circumference of the shaft of the
threading ring assembly with the cleaning cloth
moistened with the cleaning fluid.
6. Insert the compression coil spring into the shaft.
While aligning the recessed part of the bottom
flange with the protruded portion on the
threading ring, insert the bottom flange. (Fig.-1)
7. Inert the new preceding roller assembly into the
shaft in the direction as shown. (Fig.-2)
8. Attach the top flange.
Adjustment After Replacement
9. Perform the Tape Path Adjustment.
(Refer to section 7-2.)
Threading ring assembly
Preceding roller assembly
Worm gear
Pinch arm assembly
Compression coil spring
Bottom flange
Top flange
Fixing screw (P 1.4
x
2.5)
Preceding roller assembly
Fig.-2
(Top)
(Bottom)
Fig.-1
Bottom flange
Gear box assembly
Diameter of hole
is smaller
Diameter of hole
is larger
Protruded ( ) portion of
loading ring
Recessed ( )
portion of
loading ring
Shaft
Содержание DVCAM DSR-60
Страница 2: ......
Страница 54: ......
Страница 174: ......
Страница 220: ......
Страница 236: ......
Страница 238: ...8 2 N DSR 80 80P 60 60P SY 241B 241 CV101 CHARA SIZE 10 1 N DSR 60 80 ...
Страница 242: ...8 2 P DSR 80 80P 60 60P SY 241B 241 CV101 CHARA SIZE 10 1 P DSR 60P 80P ...
Страница 284: ......