
8 | Commissioning
28 / 36
Installation instructions sonnenProtect 1300
If the sonnenProtect is behaving as described in section Function [P. 11], the function
test is successful. The sonnenProtect can be operated.
If the sonnenProtect is not behaving as described in section Function [P. 11], the
sonnenProtect must not be operated.
In this case, check the wiring (see section Installation with sonnenBatterie eco 8.2
[P. 17] or Installation with sonnenBatterie eco 9.43 [P. 22]).
Contact the sonnen customer service if the problem cannot be solved.
8.3 Setting up the sonnenProtect
8.3.1 Generating a commissioning code
We recommend that you generate a commissioning code before installing the
sonnenProtect on the premises of the storage system operator.
Conditions:
ü
There must be an Internet connection.
ü
You must have access details for the Internet portal.
Enter the following address into your browser’s address line to access the Internet
portal: https://my.sonnen-batterie.com
Log on to the Internet portal.
Go to the page called ‘sonnenProtect’.
Enter the serial numbers of the sonnenBatterie and the sonnenProtect units
which are to be connected. You will find the serial numbers on each unit’s type
plate.
Confirm your entries. The commissioning code will be displayed.
Make a note of the commissioning code.
8.3.2 Establishing connection to the storage system
Connect the laptop (4) to the router of the home network (2). The storage sys-
tem must also be connected to the router of the home network.
4
3
1
2
Illustration 21: Ethernet wiring
Содержание Protect 1300
Страница 34: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried...
Страница 35: ......
Страница 36: ......