Installation with sonnenBatterie eco 9.43 | 7
KD-345 | 22041 | EN | X02
23 / 36
Option 2: use the GP measurement concept (setup 4)
Advantage: the consumption of the electrical consumer connected to the sonnenPro-
tect is added to the household consumption calculation through measurement point G
(grid).
Disadvantage: if the GP measurement concept has been used previously, the con-
sumption measurement point needs to be changed. To do so, proceed as follows:
Remove the clamp-on current transformer at measurement point C (consump-
tion) and install it at measurement point G (grid).
Change the power meter setting and select the ‘Setup 4’ measurement concept in
the commissioning wizard (on the ‘Power Meter’ page).
Consult the ‘Power meters’ instructions (KD-300) for detailed information on
the measurement concepts and their use.
7.2 Installing the mains filter
LOAD
LINE
N'
L
N
L'
Illustration 15: Installation mains filter on
mounting rail
Remove the end stop on the left side
of the relay K1 on the mounting rail.
Install the mains filter on the mount-
ing rail.