
Figure 11: Receive Module with cables connected
Prior to mounting the Receive Module, the block that holds the sound velocity probe must be
secured through the underside of the mounting bracket. Next, mount the Receive Module in the
mounting frame. This can be most easily done by putting the receive module face on a piece of
cardboard or other material and then lowing the mounting frame down with the threaded bolts
passing through the mounting frame. The threads, of the securing bolts, after passing through the
frame,
must be wrapped with 2 wraps of Teflon™ tape
. This is to prevent galling where the nut will
freeze on the bolt.
Do not tighten beyond 17Newton metre
(150 pound-inch or 12.5 pound-foot).
Figure 13: Position the insulating bushing, then wrap threads with Teflon tape, then secure with flat washer, locking
washer and then nut.
3.1.3
Mounting the Projector
The projector is secured to the frame with two, 35mm stand offs. The
stand-offs allow room for the Projector to Receive Module cable to be
run. A 6mm drive hex screw secures the projector through the stand-
off.
The Projector’s connector faces towards the protection fin
.
Connect the 0.439m interconnect cable’s female end to the Projector’s
male bulk head connector. When the connectors are mated, there
should be no visible gap between them. A very light spray of silicon
lubricant will aid seating the connector.
Figure 12: Sonic 2024 Projector
Sonic 2024
Sonic 2022
SV Probe block is secured, via screws, though the underside of the mounting frame
Page
27
of
210
Version
5.0
Rev
r002
Date
05-08-2014
Содержание 2022
Страница 2: ...Page 2 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 4: ...Page 4 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 37: ...Figure 26 Projector cable configuration Page 37 of 210 Version 5 0 Rev r002 Date 05 08 2014 ...
Страница 68: ...Page 68 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 86: ...Page 86 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 90: ...Page 90 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 92: ...Page 92 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 100: ...Page 100 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 104: ...Page 104 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 105: ...7 7 I2NS Drawings 7 7 1 I2NS IMU Figure 117 IMU Drawing Page 105 of 210 Version 5 0 Rev r002 Date 05 08 2014 ...
Страница 126: ...Figure 127 Smooth log information copied from real time survey log ...
Страница 150: ...Page 150 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 164: ...Page 164 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 196: ...Page 196 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 198: ...Figure 168 Sonic 2024 2022 Projector Page 198 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 199: ...Figure 169 Sonic 2024 Receive Module Page 199 of 210 Version 5 0 Rev r002 Date 05 08 2014 ...
Страница 200: ...Figure 170 Sonic 2022 Receive Module Page 200 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 201: ...Figure 171 Sonic 2024 Mounting Bracket Drawing 1 Page 201 of 210 Version 5 0 Rev r002 Date 05 08 2014 ...
Страница 202: ...Figure 172 Sonic 2024 Mounting Bracket Drawing 2 Page 202 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 203: ...Figure 173 Sonic 2022 Mounting Bracket Drawing 1 Page 203 of 210 Version 5 0 Rev r002 Date 05 08 2014 ...
Страница 204: ...Figure 174 Sonic 2022 Mounting Bracket Drawing 2 Page 204 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 205: ...Figure 175 Sonic 2024 2022 Mounting Bracket Flange Page 205 of 210 Version 5 0 Rev r002 Date 05 08 2014 ...
Страница 206: ...Figure 176 SIM Box Drawing Page 206 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...
Страница 207: ...Figure 177 SIM Stack Outline Page 207 of 210 Version 5 0 Rev r002 Date 05 08 2014 ...
Страница 209: ...Figure 179 I2NS IMU Dimensions Page 209 of 210 Version 5 0 Rev r002 Date 05 08 2014 ...
Страница 210: ...Figure 180 I2NS SIM Dimensions Page 210 of 210 Version 5 0 Rev r002 Date 05 08 2014 Part No 96000001 ...