Export Power Manager
Quick installation
instructions
Solis-EPM3-5G-Plus
1
Determine location of EPM
Step 1: Mark A,B,C,D mounting holes on the wall.
2
Step 3: Hang the EPM on the bracket by the steps below.
Ningbo Ginlong Technologies Co., Ltd.
C
Following minimum clearance is required.
300mm
300mm
3
0
0
m
m
3
0
0
m
m
Install the EPM
B
A
C
D
Step 2: Drill four φ8 holes and fix the bracket onto the wall
with expansion bolts.
Expansion screws
Bracket
Step 4: Fix the two locking screw on both side of the bracket
and connect the grounding wire to the grounding screw.
M4 locking screw
M4 locking screw
Grounding
screw
1. Grid input cable -> Grid Port
Connect cables
3
3 connect
to L3
connect
to N
connect
to
2 connect
to L2
1 connect
to L1
Connect the grid input cables to the grid connector and
then to the Grid port of the EPM as described below.