EXPRESS DAS
Installation and Operations Manual
EXPRESS DAS Installation and Operations Manual – Version 2.2 November 2013
61
Before you begin this part of the installation process, make sure you have the following items. Those
items marked with an “O” ship with the unit. The installer will supply items marked with an “X.”
Unit
Item / Action
Accessories
Tools Required
Status
BIU
Chassis rack mounting
M6 Screw (4 EA)
No.0 Screw driver (+)
X
Ground connection
AWG #10-12 cable
No.0 Screw driver (+)
Lug crimper
X
RF cable connection to Base
Station
RF SMA-P cable
Spanner (8mm)
X
Power Shelf Mounting
M6 Screws (4 EA)
No.0 Screw driver (+)
X
Power cable connection
DC -48V power cable (1 Pair)
[AWG #12, 2 meter, with 4.5 ø
square lugs at both ends]
No.0 Screw driver (+)
O
ODU
Chassis rack mounting
M6 Screws (4 EA)
No.0 Screw driver (+)
X
Ground connection
M4 Screw (Electric Current/
1EA)
No.0 Screw driver (+)
X
AWG #10~1 2 Cable
No.0 Screw driver (+)
Lug crimper
X
Connection to ROU or OEU
Optic SC/APC cable (1 per
ROU)
X
Connecting with BIU
Power Cable (1EA)
[700 millimeter, with D-SUB
15PIN(MALE/to BIU) connector
at one end, D-SUB 15PIN
(FEMALE/to ODU) connector at
another end]
O
Connection with BIU
Connection with ROU or OEU
RF Cable (2EA) [SS405 White,
670 millimeter, with SMA-SP
(MALE) connector at both ends]
Spanner (8mm)
Torque: 8~12kgf.cm
O
Optic SC/APC Cable
-
X
DMS
DMS-1200 rack mounting
M6 Screws (4 EA)
No.0 Screw driver (+)
X
WAN port connection
Straight type LAN cable (1EA)
X
BIU port connection
Straight type 2m LAN cable
(1EA)
O
Connection to power supply
AC 110-220V Power Cable
O
Table 8
.
1 – Tools and Accessories for Installing Headend Equipment
Содержание EXPRESS Single-Carrier DAS
Страница 10: ......