EXPRESS DAS
Installation and Operations Manual
90
EXPRESS DAS Installation and Operations Manual – Version 2.2 November 2013
10.4
Connect Ground Terminal
The MRU and ARU each have one ground terminal port at the bottom of the unit. The ground lug is
designed meeting the SQ5.5 standard.
Figure 10
.
10 – MRU / ARU Ground Terminal
1- Take off the GND terminal port from the enclosure and connect to the ground cable. Then reconnect it
to the enclosure.
2- Connect the opposite end of the ground cable to the communication GND of the building.
Содержание EXPRESS Single-Carrier DAS
Страница 10: ......