The wall is composed of 2 x 2 plasterboard boards, 12.5 mm thick, installed on a steel
frame construction. The interior of the wall is filled with mineral wool (≥ 100 kg/m³).
The minimum thickness of the wall is 100 mm.
1
2
3
FLEXIBLE WALL
INSTALATION MF1/MF2
INSTALLATION FRAME
INSTALLATION
1. Create an opening in the wall (FDC25 - Ø d + 10 mm, FDC40 - Ø d + 25 mm) and build
the subframe according to the drawing, see
.
Damper blade must be closed during installation!
2. Place the fire damper in the opening.
3. Fasten the fire damper with screws.
FDC25: 4 pcs 6 x 160 mm
FDC40: 12 pcs 6 x 160 mm