background image

TOOLS REQUIRED

• 5/32 inch hex key

• 3/4 inch wrench or deep socket

SOLAR BOLLARD 2SPBL13/2SPBL14

Installation instructions

INSTALLATION

With a one to two foot setback from the path or area to be illuminated, install concrete footing with supplied 
anchor bolts. Align anchor bolts to path as shown below using the supplied cardboard  template to hold the
bolts in position.

2SPBL13/14-T2

123 Town Square Pl., #333     Tel. +1.201.490.4499

Jersey City, NJ 07310       

www.solarpathusa.com

2SPBL13/14-T5

Ø10.23”

Ø5.90”

Ø8.50”

32

.2

6”

24

.4

6”

0.

84

1.

65

Option 1

Option 2

3.14”

0.39”

0.78”

15.74”

3.93”

PRIOR TO INSTALL

Ensure install location receives at least 2 to 3 hours of midday  
sun on average. Please handle bollard with care as scratches  will 
affect appearance and powder coat durability.

2SPBL13/14 MODEL

Please refer to the diagram below to identify the model you are  
installing. 

Отзывы: