background image

Important:

 This guide is not intended to replace the Solaria PowerXT-R-AC Module installation instructions. This is a 

brief overview of the module mounting installation process. 

Always refer to the Installation manual for all safety and 

proper installation methodologies.

Quick Start – Solaria PowerXT-R-AC Module

© 2019 Solaria Corporation All rights reserved. Contents Subject to change.

Quick Start Guide 

Solaria PowerXT-R-AC Module Mounting 

Guidelines

Step 1. Plan and install the racking

Allowable rail locations with example of typical rail 
configuration shown back of module view.

Step 2. Position the Enphase Q cable

A.  Plan each cable segment to allow drop connectors 

on the Enphase Q Cable to align with each AC 
Module. Allow extra length for slack, cable turns, 
and any obstructions.

B.  Lay out the cabling on the racking for the AC branch 

circuit. Make sure the cable is positioned in a way 
that allows you to connect it to the microinverter.

Redefining Home Solar

12”

4” CLAMPING 

AREA

 6” CLAMPING AREA

FRAME

Step 3:  Connect the Enphase Q Cable into the junction box (Transition box to your homerun wiring)

Step 4: Terminate the Unused End of the Cable

Step 5: Ground the system

Отзывы: