5 Prepare heat pump
Abb. 2-13: Crane transport with lifting aid
5.2 Attach sealing tape
►
For optimum thermal and acoustic sealing, affix
the enclosed sealing tape
1
over the underside of
the base (over the entire base circumference).
Abb. 2-14
5.3 Dismantling the cover
►
Loosen the cylinder head screws TX25
1
and
remove the covers.
Abb. 2-15
5.4 Remove cladding
►
Loosen the 6 bolts (TX25 )
1
, remove cladding
2
.
Abb. 2-16
5.5 Remove transport lock
i
Only required for K 12 and K 15
►
Loosen 4 pcs. screws
1
and permanently remove
transport lock
2
.
Abb. 2-17
5.6 Connect the heat pump to the power
supply before commissioning
i
Connect the heat pump to the power sup-
ply at least 12 hours before com-
missioning.
The oil sump heating then starts the heating process,
this pre-heating ensures smooth commissioning of
the heat pump.
18
Installation manual
vampair
Содержание Vampair
Страница 31: ...8 Electrical connection Installation manual vampair 31 8 5 Electrical connection plan ...
Страница 39: ...10 Foundation plan Installation manual vampair 39 Side view of foundation Section A A Abb 2 48 ...
Страница 44: ...Front view of foundation Section B B Abb 2 55 11 Flat roof set up 44 Installation manual vampair ...
Страница 51: ...12 Plant schematic Installation manual vampair 51 ...