3.1 Warranty, guarantee, liability
3.1.1 Technical requirements for warranty and gua-
3.2 Standards, guidelines, regulations
3.3 Specifications for cooling mode
3.4 Installation location, installation position
3.5 Foundation for the heat pump
3.7 Heating system fill-up water
3.7.2 Avoiding water-side corrosion
3.8 Information about the hydraulic connection
5.6 Connect the heat pump to the power supply
6 Install electric heating element
6.2 Heating element and components
6.4 Connect the heating element
6.5 Fit the sensors (2x) in the heating element 21
7.1 Make condensate drain, seal
7.3 Install the primary circuit circulation pump
7.4 Connect the primary circuit
7.4.1 Connection on the condenser
7.4.2 Cut insulating mat (only required for K 08 and K 10) 23
7.4.3 Primary circuit connection set
7.4.4 Fit temperature sensor T1 for condenser
7.5 Pipe dimensions: Residual delivery height
8.3 Seal the connection cable piping
8.4 Terminal area, electrical supply
8.5 Electrical connection plan
8.6 Connect ecomanager-touch control
8.6.2 Surface-mounted installation
8.7 Connect electronic module D1
8.7.1 Terminal assignment - overview
8.7.2 Connection of the bus cable
8.7.3 Bus terminating resistor
8.7.4 Connect the primary circuit circulation pump
8.7.6 Heating circuit - switch externally (optional)
8.7.7 Connecting the mains power supply to the elec-
8.7.8 Device address of the electronic module
8.7.9 Elec. fuses in the electronic module
8.8 Outside temperature sensor - position
8.9 Connecting the control to the internet
10.2 Line connection to the rear
2
Installation manual
vampair
Content
Содержание Vampair
Страница 31: ...8 Electrical connection Installation manual vampair 31 8 5 Electrical connection plan ...
Страница 39: ...10 Foundation plan Installation manual vampair 39 Side view of foundation Section A A Abb 2 48 ...
Страница 44: ...Front view of foundation Section B B Abb 2 55 11 Flat roof set up 44 Installation manual vampair ...
Страница 51: ...12 Plant schematic Installation manual vampair 51 ...