5 Installation
Install the feeder sensor
►
Fix the feeder sensor
1
in the retaining tube
►
Connect to
A1:X33
, cable is pre-routed in ducts
3 and 2
Abb. 2-35: Install the feeder sensor
Connect the feeder motor
►
Connect the pre-routed cable as shown in the ter-
minal area of the motor.
Abb. 2-36: Connect the cable in the motor terminal area
FU1
Feed motor
Cable
U
U1
black
V
V1
brown
W
W1
grey
PE
PE
yellow/green
For frequency converter
FU1
see inside of boiler cabi-
net door
5.6 Install the hot air fan
►
Mount cover
1
and
2
.
►
Install hot air fan
3
in ignition pipe and secure
with t-bolt hose clamp.
►
Connecting to terminals:
Fan
A1:X7
Heating element
A1:X4
►
The cable is pre-routed in ducts 3 and 2
Abb. 2-37: Install the hot air fan
5.7 Install safety valve
►
Install the safety valve
1
(or boiler safety group)
in the boiler supply line, at the highest point of the
line, as close as possible to the boiler. Observe
installation position.
!
ATTENTION
- Do not install any barriers in
the pipework that could render the safety
valve ineffective.
5.8 Installing return flow boost
Information on return flow booster
28
Installation manual
maximus L
Содержание maximus L 150
Страница 16: ...Front Abb 2 10 Side view Abb 2 11 3 Technical requirements 16 Installation manual maximus L ...
Страница 44: ...11 Annex 11 1 Mounting boiler covers overview Abb 2 72 Abb 2 73 11 Annex 44 Installation manual maximus L ...
Страница 50: ...11 Annex 50 Installation manual maximus L ...
Страница 51: ...11 Annex Installation manual maximus L 51 ...