5 Installation
5.3.5 Connect burner and heat exchanger
hydraulically
►
Join and insulate both connections (pipe and
insulation not included in scope of delivery)
Abb. 2-31: Connect the water circuit
5.4 Mount feeder grate drive
►
Mount drive unit
1
(plate, housing, motor/-
gearbox) to the burner with 4× hexagon screws.
►
Mount connecting rod
2
with washer and circlip
on the bolt
3
.
►
If necessary (to turn the crank), remove motor/-
gearbox
4
.
►
Connect motor. Cable
X4.7-X4.9
is pre-routed in
ducts 3 and 2
.
Abb. 2-32: Mount feeder grate drive
Connect the feed grate motor
►
Connect the pre-routed cable as shown in the ter-
minal area of the motor.
Abb. 2-33: Connect the cable in the motor terminal area
5.5 Install the feeder unit
►
Mount the feeder unit
1
including installed rotary
valve on the burner with 4× hexagon screws.
►
Set adjustable foot
2
.
►
Connect the feeder motor
3
to the cable
FU1
pre-
routed in ducts 3 and 2
: U,V,W
.
i
Check - swap two phases if the direction of
rotation is wrong.
Abb. 2-34: Install the feeder unit
Installation manual
maximus L
27
Содержание maximus L 150
Страница 16: ...Front Abb 2 10 Side view Abb 2 11 3 Technical requirements 16 Installation manual maximus L ...
Страница 44: ...11 Annex 11 1 Mounting boiler covers overview Abb 2 72 Abb 2 73 11 Annex 44 Installation manual maximus L ...
Страница 50: ...11 Annex 50 Installation manual maximus L ...
Страница 51: ...11 Annex Installation manual maximus L 51 ...