4
Connecting an LG Chem RESU10H Battery to a StorEdge Inverter with Two DIP Switches and SolarEdge Meter
2 DIP
Switches
24 AWG 300V
G <> G
LG Chem RESU10H Battery
StorEdge Inverter
SolarEdge Electricity Meter
B- <> B- and A+ <> A+ on the same twisted pair
RS485_H <> A and RS485_L <> B- on the same twisted pair
ENABLE_H <> En
EN_G <> Thermal-
24 AWG 600V
RS485-terminated
10 AWG (14-10 AWG) 600V insulated
Figure 2: Connecting an LG Chem RESU10H Battery to a StorEdge Inverter with Two DIP Switches and SolarEdge Meter
Connecting an LG Chem RESU10H Battery to a StorEdge Inverter with Three DIP Switches and SolarEdge Meter
3 DIP
Switches
24 AWG 300V
G <> G
LG Chem RESU10H Battery
StorEdge Inverter
SolarEdge Electricity Meter
B- <> B- and A+ <> A+ on the same twisted pair
RS485_H <> A and RS485_L <> B- on the same twisted pair
ENABLE_H <> En
EN_GND <> G
24 AWG 600V
RS485-terminated
10 AWG (14-10 AWG) 600V insulated
Figure 3: Connecting an LG Chem RESU10H Battery to a StorEdge Inverter with Three DIP Switches and SolarEdge Meter