SolarEdge StorEdge LG Chem RESU10H Скачать руководство пользователя страница 8

8

 

 

 

Post Installation Verification and Configuration 

Follow the checklist below to verify that the system is properly connected and configured. The checklist is suitable for a backup system with a single StorEdge Inverter, a single battery, an 
Auto-transformer and a single SolarEdge Electricity Meter installed at the grid connection point. For other system configurations, follow the steps in the StorEdge Installation Guide supplied 
with the StorEdge Inverter. 

Step 

Verification Action 

Checked 

Installation and Wiring 

1.1 

Verify that the distance between components complies with the distances detailed in the supplied installation guide. 

 

1.2 

Take a photograph of the battery connection area and send to SolarEdge support (useful for future debugging if necessary.) 

 

1.3 

Take a photograph of the connection area of the StorEdge Inverter and send it to SolarEdge support. 

 

1.4 

Take a photograph of the installation and send to SolarEdge support. 

 

1.5 

Verify that the battery splash cover is closed. 

 

1.6 

Verify that the backed-up loads panel is wired (relevant for backup systems only). 

 

1.7 

Verify that the Auto-transformer’s AC and temperature sensor wires are connected as above in Figure 5. 

 

1.8 

Verify that the Inverter’s DIP switches are configured to connect to the Auto-transformer, as shown above in Figure 2 (for boards with two DIP switches), and 
Figure 3 (for boards with three DIP switches).  

 

1.9 

 

Verify that all DC, communication and AC cabling connections are completed as follows: 

1.9.1 

Check AC wiring and circuit breaker. 

 

1.9.2 

Check string DC input voltage. Expect 1V per optimizer in the string. 

 

1.9.3 

Verify that grounding is properly connected in the battery and inverter. 

 

1.9.4 

Check DC wiring to the battery (see Table 1). Check the connections and verify that all are securely connected. 

 

1.9.5 

Check connections to the battery and the DIP switch setup as described earlier in this document. 

 

1.9.6 

Check connections to the meter.  If no meter is connected, the inverter’s RS485 bus must be terminated using the DIP switches on the inverter’s 
communication board (see page 7). 

 

1.9.7 

Check that a 9V battery is installed in the StorEdge Inverter. 

 

1.9.8 

Check connection to the Internet with one of the following options: Cellular, Ethernet, ZigBee Module. The connection status displayed should be S_OK.   
Note: For inverters with a built-in cellular communication option, Ethernet or ZigBee Module can be used as an alternative if the cellular service does 
not meet operational requirements.   

 

 

Содержание StorEdge LG Chem RESU10H

Страница 1: ...attery wiring guide and contains an on site checklist with steps for post installation verification of a StorEdge system for the following batteries LG Chem RESU10H CAUTION For proper battery performa...

Страница 2: ...ith the disconnect switch requires Firmware version 3 24xx or later With the auxiliary power switch Figure 1 LG Chem Disconnect Auxiliary Power Switch and Circuit Breaker To power off the battery 1 Tu...

Страница 3: ...H V Not connected B RS485 RS485_L A RS485 RS485_H G RS485 or Thermal depending on inverter type EN_G Wiring Diagrams Connecting Batteries to the StorEdge Inverter The diagrams on the following pages i...

Страница 4: ...nnecting an LG Chem RESU10H Battery to a StorEdge Inverter with Two DIP Switches and SolarEdge Meter Connecting an LG Chem RESU10H Battery to a StorEdge Inverter with Three DIP Switches and SolarEdge...

Страница 5: ...Two LG Batteries LG Chem RESU10H Battery 2 LG Chem RESU10H Battery 1 ENABLE_H 24 AWG 600V EN_GND RS485_H and RS485_L on the same twisted pair 12 10 AWG 600V insulated Junction Box Figure 4 Connecting...

Страница 6: ...6 Wiring Diagrams Auto transformer Connection Figure 5 Connecting the Auto transformer to the Inverter...

Страница 7: ...n Not terminated meter is installed For RS485 2 connections use DIP Switch 2 rightmost ON up Terminated no meter installed OFF down Not terminated meter is installed Setting the DIP Switches on the In...

Страница 8: ...nsor wires are connected as above in Figure 5 1 8 Verify that the Inverter s DIP switches are configured to connect to the Auto transformer as shown above in Figure 2 for boards with two DIP switches...

Страница 9: ...OFF switch 2 7 Turn ON the AC to the inverter to start activation 2 8 Wait until the LCD indicates that the inverter activation process is completed 2 9 Turn the AC to the inverter OFF 2 10 Remove th...

Страница 10: ...3 5 Battery 3 5 1 Select Communication RS485 1 Battery 1 Protocol LG Battery Select Communication RS485 1 Battery 1 Battery ID 15 If installing two batteries ensure that each battery has a different...

Страница 11: ...y Check the LEDs when configured as export import meter green import red export To verify whether the CT direction is correct turn the inverter ON OFF switch to OFF and check the export screen If the...

Страница 12: ...between the battery and inverter are properly connected Low SOE Charge the battery to 20 percent SOE at least Battery comm error Check that the communication cables between the battery and inverter a...

Страница 13: ...er is successfully charging the battery 9 3 If the battery does not charge Record the date of manufacture which is embedded in the part number The part number is printed on a label on the control pane...

Отзывы: