background image

Appendix B: Specifications 

SolarEdge Installation Guide - MAN-01-00060-2.6 

64 

Three Phase inverters 

SE4k 

SE5k 

SE7k 

SE8k 

SE9k 

SE10k 

SE12.5k SE15k 

SE16k 

SE17k 

Unit 

Exit 

AC output power rating 

4000 

5000 

7000 

8000 

9000 

10000 

12500 

15000 

16000 

17000 

GOES 

Maximum output power AC 

4000 

5000 

7000 

8000 

9000 

10000 

12500 

15000 

16000 

17000 

GOES 

Rated output voltage CA - 
line by line / line to neutral 
(nominal) 

380/220; 400/230; 415/240

Vac 

AC output voltage range 

184 to 264.5 

Vac 

AC frequency 
(nominal) 

50/60 ± 5 

Hz 

maximum intensity DC 
output (per phase) 

6.5 

11.5 

13 

14.5 

16 

20 

23 

25.5 

26 

AT 

Protection against 
maximum current of the 
overcurrent 

6.5 

11.5 

13 

14.5 

16 

20 

23 

25.5 

26 

AT 

residual current detector / 
detector gradual residual 
current 

300/30 

my 

Supported networks - 
three phase 

3 / N / PE; 230/400

CA startup current 
(peak / duration) 

154/0050 

A / ms 

maximum fault current 
output 

33 

40 

AT 

power factor range 

+ / - 0.9 to 1.0 

Protection class 

class I 

Utility Monitoring, islanding 
protection, power factor 

configurable, configurable 
thresholds countries 

Yes 

category 
protection against 
overvoltage 

III 

Содержание SE10k

Страница 1: ......

Страница 2: ...reviewed continuously and modified if necessary However discrepancies can not be excluded No guarantees are made for the completeness of these documents Compliance with emission standards This equipment has been tested and found to comply with the limits by local regulations These limits are designed to provide reasonable protection against harmful interference in a residential installation This e...

Страница 3: ... com Greece 00800125574 support solaredge com Israel 972 73 240 3118 Netherlands 08000221089 For the rest of the world 972 73 240 3118 Fax 972 73 240 3117 Before contacting us make sure you have the following information handy The model numbers of the inverter and power optimizer The product serial number in question The error indicated on the display of the inverter or the SolarEdge Monitoring Po...

Страница 4: ... Optimizers 12 Step 2 Connecting a module to a power optimizer 13 Step 3 Connect the power optimizers channels 13 Step 4 the correct connection Checking the power optimizer 14 Chapter 3 Installation of the inverter 16 Package contents of the UPS 16 Identifying the Inverter 16 The interfaces between the inverter 16 Mounting the Inverter 18 AC connection to the inverter 21 Instructions for connectin...

Страница 5: ...tus of the power control 42 Chapter 6 Configuring Communications 43 communication connectors 43 Communication Types 44 Removing the cover of the inverter 44 Creating an Ethernet LAN 45 Creating an RS485 Bus Connection 47 Creating a ZigBee connection 50 Creating a wireless connection 50 Connection Verification 51 Appendix A Errors and Troubleshooting 52 Troubleshooting communication problems S_OK d...

Страница 6: ...060 2 6 5 Appendix D Safety CC 74 Appendix E Maintenance and replacement of fan 75 Fan Interview 75 Replacing the fan 2 75 Appendix F Replacing and Adding System Components 77 Replacing an inverter 77 Adding removing or replacing power optimizers 77 ...

Страница 7: ...ntion to a procedure which if not performed correctly or adhered to could result in injury or loss of life Do not proceed beyond a warning note until the indicated conditions are fully understood and met WARNING Indicates danger It calls attention to a procedure which if not performed correctly or adhered to could result in damage or destruction of the Indicates danger It calls attention to a proc...

Страница 8: ...ted when the dimmer switch is on unless grounded WARNING This unit must be used according to the specifications of operation as described in the latest datasheet specifications available on the website of SolarEdge http www solaredge com groups products overview WARNING The inverters are IP65 class Unused connectors and cable glands must be sealed with the gaskets supplied NOTE Use PV modules clas...

Страница 9: ...ptimizer to 1 Vpp in case of failure or when disconnected from the inverter or when the ON OFF switch of UPS is turned off Each power optimizer also transmits module performance data on the DC power line to the inverter Two types of power optimizers are available A power optimizer added to the module connected to one or more modules An integrated power optimizer module integrated in a module Solar...

Страница 10: ...also apply to the modification of an existing site page 11 Pages 14 and 27 page 16 Pages 21 and 23 page 24 page 27 page 30 Record serial numbers of the power optimizers Inverter installation Commissioning and activation of the installation Connecting the inverter to the SolarEdge Monitoring Portal UPS configuration Connecting the power optimizers and the modules on a chain Connection strings and A...

Страница 11: ...er For the communication options installed you may also need the following For Ethernet pair Ethernet cable twisted CAT5 6 RJ 45 plugs Crimping tool RJ 45 For RS485 twisted pair of four or six son Set of precision watchmaking screwdriver Transport and storage of the inverter Transporting the UPS in its original packaging facing up and without exposure to unnecessary shocks If the original packagin...

Страница 12: ...pplicable the impact on the module warranty Drilling holes in the module frame can be done according to the instructions of the module manufacturer WARNING The installation of SolarEdge system without ensuring compatibility module connectors with Optimizer connectors may be dangerous and could cause functionality problems as defects of grounding resulting in switching the inverter To ensure mechan...

Страница 13: ... modules are fewer than the minimum required add other optimizers in the string Do not let the connectors discovered power optimizers Open connectors must be connected to each other Step 1 Mounting the Power Optimizers 1 Determining the power optimizer mounting location and use of media 1 Determining the power optimizer mounting location and use of media fixing the power optimizer to fix it to the...

Страница 14: ...under and output connectors Step 3 Connecting Power Optimizers channels You can build strings in parallel of unequal length that the number of power optimizers on each channel may be different maximum and minimum chain lengths are shown in the data sheet of power optimizers Refer to the SolarEdge site designer for verification of the chain length NOTE The string length must not exceed 300m from th...

Страница 15: ...the introduction of power optimizers between PV modules and the inverter the significance of the current terms of short circuit I SC and open circuit voltage V OC is different from that of traditional significance of the current terms of short circuit I SC and open circuit voltage V OC is different from that of traditional significance of the current terms of short circuit I SC and open circuit vo...

Страница 16: ...before their connection to other chains or the inverter Verify the correct polarity by measuring the polarity of the channel using a voltmeter Use a multimeter with a measuring accuracy of at least 0 1 V 2 For troubleshooting problems with operation of power optimizers see 2 For troubleshooting problems with operation of power optimizers see you Troubleshooting power optimizers on page 60 you Trou...

Страница 17: ... Electrical Specifications Report serial number Refer to the sticker on the UPS indicating its Serial number and his Electrical Specifications Report serial number Refer to the sticker on the UPS indicating its Serial number and his Electrical Specifications Report serial number Refer to the sticker on the UPS indicating its Serial number and his Electrical Specifications Report serial number when...

Страница 18: ...the ON OFF switch of the inverter is turned off or when an error occurs Yellow Communication module and inverter off Turn signal monitoring information received from a power optimizer The inverter is under extinction Red Breakdown We An error has occurred Refer to the Appendix A Errors and Troubleshooting on page We An error has occurred Refer to the Appendix A Errors and Troubleshooting on page W...

Страница 19: ...r of 20 mm each for the connection of communication options of the inverter Each gland has three openings refer to the Chapter 6 Communication Setup on page 43 for more the inverter Each gland has three openings refer to the Chapter 6 Communication Setup on page 43 for more the inverter Each gland has three openings refer to the Chapter 6 Communication Setup on page 43 for more information Mountin...

Страница 20: ... Figure 6 Mounting with U shaped notches face upwardly For type 2 Ensure that the flat portion of the support is downwardly as shown in Figure 8 Use at least two holes for the support Additional holes can be used to secure the bracket Identify holes and how much will be used depending on the type and material of the mounting surface 2 Drill the holes and mount the bracket Check that the support is...

Страница 21: ...upport and lower the inverter jusqu à it is placed evenly on the support Figure 8 Hanging the inverter to support Type 2 4 Insert two screws through the fin outside the heat sink on both sides of the inverter and in the support Tighten the screws using a torque of 4 0 N m 2 9 ft lb Figure 9 Insertion of the stand mounting nick Mounting Flange Bracket Screw type support 2 media type 1 Bracket Screw...

Страница 22: ...detailed information refer to u Manual balancing phase SolarEdge available on the SolarEdge website http www solaredge com files pdfs phase_balancing_connection_guide pdf http www solaredge com files pdfs phase_balancing_connection_guide pdf Connecting to CA Use a cable with three phase connection for a son or a son five cable for three phase connection The maximum size of the son of the terminals...

Страница 23: ...etween between L1 to L2 and L2 to L3 between must be maintained L1 L2 L3 and not for example L1 L3 L2 A phase difference of 120 º between between L1 to L2 and L2 to L3 between must be maintained L1 L2 L3 and not for example L1 L3 L2 A phase difference of 120 º between L1 and L2 between L2 L3 should be maintained If the network lines are not in that order an error will be displayed on the LCD and t...

Страница 24: ... 1 The default value for the protection against electric shock of 30 mA and a current of 300mA slow growth If an external RCD is required by local regulations check the type of RCD required by the local electrical code SolarEdge recommends using a type A RCD The recommended value of the RCD is 100mA or 300mA unless a lower value is required by the local power grid When required by local regulation...

Страница 25: ...f the inverter 4 If necessary do the following before closing the lid of the inverter Country settings or configuration of the inverter user buttons of the internal LCD see Chapter 5 User Country settings or configuration of the inverter user buttons of the internal LCD see Chapter 5 User Interface page 29 Interface page 29 Connection of communication options refer to Chapter 6 Communication Setup...

Страница 26: ...nverter A safe 1V voltage will be required Vdc V the DC input voltage of the longest chain connected to the inverter A safe 1V voltage will be required for each power optimizer in the string NOTE A measurement error of 3V on the LCD screen of the inverter is acceptable Pac W the AC output power will be 0 0 if the UPS is off Pac W the AC output power will be 0 0 if the UPS is off Pac W the AC outpu...

Страница 27: ...es power This is indicated by the steady light of the green LED on the inverter Step 3 Check the health Once the reactivation time completed a status screen similar to the following screen appears on the LCD panel of the UPS V ac v V dc v P ac w 2 4 0 7 3 7 1 9 2 3 4 9 3 P _ OK XXX YYY S _ OK WE 1 Check the following 1 Check the following LED UPS green lights permanently The ON indicator STOP on t...

Страница 28: ...nverters logical layout shows a diagram of the logic arrangement of the system components for example inverters strings and modules and their electrical connections This view allows you to view which modules are connected to each string which strings are connected to each inverter and so on Physical layout shows a diagram of the physical layout of the system components for example inverters string...

Страница 29: ... file that can be downloaded from the SolarEdge Monitoring Portal for site registration The Site Mapper SolarEdge can be downloaded from the Apple iTunes Store For more information see Site Mapper SolarEdge Computer SolarEdge can be downloaded from the Apple iTunes Store For more information see Site Mapper SolarEdge Computer Guide or to Demo Movie Site Mapper available on the website at SolarEdge...

Страница 30: ...e password entry The LCD and the buttons can be used for the following Setup Mode after installing the inverter the field technician will perform the basic configuration of the inverter as Setup Mode after installing the inverter the field technician will perform the basic configuration of the inverter as described in UPS configuration using the user buttons page 30 described in UPS configuration ...

Страница 31: ... 2 Remove the cover from the UPS Open the six Allen screws from the UPS cover and remove 2 Remove the cover from the UPS Open the six Allen screws from the UPS cover and remove Gently front cover vertically lowering WARNING RISK OF ELECTRIC SHOCK do not touch uninsulated son when the UPS cover is removed 3 Press the key Validate for at least 5 seconds The following message appears 3 Press the key ...

Страница 32: ... 1 S erver LAN C onf LAN C onf RS 4 8 5 1 S C onf Z ig B ee S C onf W i F i N A RS 2 3 2 C onf I OC onfig MTR Rég de power 2 Rég de power 2 G rid ontrol C A side M anagement E nergy C tu p Men RRCR ST C nfg P uiss R eactiv C nfg P uiss A ctive R e C onf veil E quilib phases ST P f A è vanc C hrgmtval D e must 1 If Wi Fi is connected the ZigBee Conf menu is not displayed and vice versa 1 If Wi Fi i...

Страница 33: ...unication or for displaying the error log and the alerts without opening the cover of the inverter Some menus are available when you use this configuration option However the functionality is the same as when using the user buttons on the LCD 1 Place the ON OFF switch of the inverter to the OFF position 1 Place the ON OFF switch of the inverter to the OFF position 2 Press and hold the light button...

Страница 34: ...Setup Menu The figure below illustrates the hierarchical tree of the menu options that appear when you use the light button A ppair O ptimisr L angue eng C ommunication M aintenance I nfo S nettle Language E nglish A llemand spagnol E F rench I talian S nettle Communication 1 Communication 1 S erver LAN C onf RS 4 8 5 1 S C onf Z ig B ee S C onf W i F i N A I OC onfig MTR S nettle Info V ersions J...

Страница 35: ...age selection on the confirmation screen Switch on YES and press 2 Confirm the language selection on the confirmation screen Switch on YES and press 2 Confirm the language selection on the confirmation screen Switch on YES and press 2 Confirm the language selection on the confirmation screen Switch on YES and press sure Validate sure Validate Communication 1 Select Communication to define and conf...

Страница 36: ...A dr S erver D e f P ort S erver Conf RS485 1 Ypeappareil T SE P rotocol M Device ID 1 D Detected SLV 0 Conf ZigBee enabled only if the indoor unit is connected Ypeappareil T SE P rotocol ERA Device ID 1 IDPAN S canner C anal hrg C ZB pard e f D Detected SLV 0 Conf WiFi enabled only when the module is connected S cannerlesr é S é aisirlacl buckets C hargerlesparam è é be trespard RS232 next page I...

Страница 37: ...number of seconds the backlight of the LCD screen is activated after pressing the light button on LCD Time 30 The number of seconds the backlight of the LCD screen is activated after pressing the light button on LCD Time 30 The number of seconds the backlight of the LCD screen is activated after pressing the light button on the LCD Set a value in a range between 10 120 seconds TLM Time 15 The numb...

Страница 38: ...ent to the SolarEdge Monitoring Portal Reset counters Reset the accumulated energy meters sent to the SolarEdge Monitoring Portal Reset factory Carry out a general reset of the default settings of the inverter Reset factory Carry out a general reset of the default settings of the inverter M à J SW SD card Perform a software update via SD card M à J SW SD card Perform a software update via SD card ...

Страница 39: ...g procedure If XXX and YYY values differ there may be a problem in one or more power optimizers S_OK The connection to the Monitoring Portal SolarEdge successful appears only if the inverter is connected to the server S_OK The connection to the Monitoring Portal SolarEdge successful appears only if the inverter is connected to the server ON OFF Indicates the position of the ON OFF switch of the in...

Страница 40: ...his value is the energy consumed If the meter is installed at the point of production of connection this value is the energy produced by the site If the meter is installed at the connection point to the network this value is the energy supplied to the network If the inverter is connected to the SolarEdge server this value will also be displayed in the monitoring portal NOTE The accumulated data ac...

Страница 41: ...K 0 indicates an error For a list of possible errors and how to resolve them see Troubleshooting 1 indicates OK 0 indicates an error For a list of possible errors and how to resolve them see Troubleshooting communication problems Page 52 communication problems Page 52 Error message according to the failure See Troubleshooting communication problems on page 52 for more Error message according to th...

Страница 42: ...and no signal H high high and no signal Status communication ports D ev P rot RS 4 8 5 1 TO S Z ig B ee SE MPS The total number of slaves detected on the specific port The total number of slaves detected on the specific port DEV The type of device that has been configured on a specific port port based feature as follows DEV The type of device that has been configured on a specific port port based ...

Страница 43: ...rter or limits the production of PV LOCAL The power is controlled locally eg by a fixed limit This inverter or limits the production of PV energy to its share of the limit of the feed energy resulting from the loss of communication with the manager smart energy If this status appears check the communication with the intelligent energy manager or the communication with the meter PWR Limit the maxim...

Страница 44: ...en configuring communication parameters make sure the ON OFF switch is in the OFF position and the CA is ON communication connectors Two glands communication are used for various communication options of the inverter Each gland has three openings The table below describes the fo nctionnalités ch at that opening Unused openings must remain sc she is openings The table below describes the fo nctionn...

Страница 45: ...ely Wireless page 50 optional wireless communication purchased separately Removing the UPS cover If the cover is not already removed eg during the initial installation while the CA is not yet connected use the following procedure to remove the cover for communication connections purposes 1 Place the switch on the inverter ON OFF OFF position 1 Place the switch on the inverter ON OFF OFF position 2...

Страница 46: ...through the opening WARNING The inside of the gland includes a tight fitting rubber which must be used to ensure a good seal Standard CAT5 6 son have eight four twisted pairs as shown in the dess diagram below o us The thread colors vary from cable the other dess diagram below o us The thread colors vary from cable the other dess diagram below o us The thread colors vary from cable the other dess ...

Страница 47: ...until the RJ45 jack on the map communication of the inverter or in the case of a cable drum and connect it as follows Insert the cable through the cable gland 1 Remove the outer insulation of the cable with the uncrimping or cable cutting tool and strip the eight son Insert eight son in the RJ45 connector as described in Figure 19 Use a crimping tool to crimp the connector Use a crimping tool to c...

Страница 48: ...insulated son when the UPS cover is removed Use the User button to configure the connection as described in Communication on page 34 Communication on page 34 NOTE If your network has a firewall you may need to configure it to allow connection to the following address Destination address prod solaredge com TCP Port 22222 inbound and outbound data 7 Check the connection as described in Connection Ve...

Страница 49: ...the RS 485 terminal block 4 Loosen the screw pine A B and BOY WUT on the left of the RS 485 terminal block Figure 22 RS485 terminal 5 Insert the ends of the son in the pine G A and B listed above Using a twisted pair cable with 4 or 6 son for this Insert the ends of the son in the pine G A and B listed above Using a twisted pair cable with 4 or 6 son for this Insert the ends of the son in the pine...

Страница 50: ...e terminal screws 8 Check that the son are fully inserted and can be removed easily 8 Check that the son are fully inserted and can be removed easily 9 Push the RS485 terminal firmly to the end into the connector on the right side of the 9 Push the RS485 terminal firmly to the end into the connector on the right side of the communication card 10 The first and last termination SolarEdge device inve...

Страница 51: ...Protocol Master Conf RS485 1 Protocol Master Conf RS485 1 Protocol Master Conf RS485 1 Protocol Master Conf RS485 1 Detect SLV Conf RS485 1 Detect SLV Conf RS485 1 Detect SLV The system starts automatically detecting inverters SolarEdge slaves connected to the master inverter The UPS will return the correct number of slaves If this is not the case check the connections and connections 4 Check the ...

Страница 52: ...nnects to the SolarEdge Monitoring Portal This can take up to two minutes A status screen similar to the following screen will appear on the LCD screen V ac v V dc v P ac w 2 4 0 7 5 2 V 0 0 S _ OK OFF S_OK indicates that the connection to the SolarEdge Monitoring Portal was successful If S_OK does not appear see Appendix S_OK indicates that the connection to the SolarEdge Monitoring Portal was su...

Страница 53: ...K and 0 indicates an error Possible errors and their resolution are detailed in the following table bit location Error message Error Description help 1 st 1 st LAN offline A mistake by the Ethernet physical wire connection the Ethernet connection or the physical Ethernet cable is not connected correctly Check cable and allocation of output pins and the cable connection Go back to Creating an Ether...

Страница 54: ...ay 2 If the message Not Found Master appears the master device is not reactive or cable RS485 2 If the message Not Found Master appears the master device is not reactive or cable RS485 2 If the message Not Found Master appears the master device is not reactive or cable RS485 2 If the message Not Found Master appears the master device is not reactive or cable RS485 is not connected check the master...

Страница 55: ...ree phase UPS on page 42 a replacement kit is Three phase UPS on page 42 a replacement kit is available from SolarEdge 4 5 8 12 18 23 39 42 45 45 48 50 53 94 108 111 113 software error Internal software error If the error persists contact SolarEdge support N A 112 Wrong AC connection The connections lines of the inverter are incorrect for example Line 1 AC network is connected to line 2 of the inv...

Страница 56: ... handle this problem and only after having taken the necessary precautions 1 Set the switch on the inverter 1 Set the switch on the inverter ON OFF OFF 2 Wait five minutes for 2 Wait five minutes for input capacitors discharge 3 Disconnect the AC circuit breaker 3 Disconnect the AC circuit breaker 4 Disconnect the inputs of 4 Disconnect the inputs of DC 5 Connect each DC string 5 Connect each DC s...

Страница 57: ...he AC wiring Application Note available on the website of SolarEdge at http www solaredge com files pdfs application noterecommended wiring pdf 15 102 DC Voltage Too High DC overvoltage The DC input voltage exceeds the maximum level supported The SolarEdge system normally eliminates DC overvoltage errors When the DC voltage is detected the inverter section power optimizers and restarts If the faul...

Страница 58: ...ion and earth leakage current problems Only an authorized PV installer can fix the faulty line before connecting it to the inverter Refer http www solaredge com files pdf s application_note_isolation_fault_ troubleshooting pdf troubleshooting pdf 26 122 AC Fault Relay AC relay failed during reactivation tests If the fault persists Unplug the network UPS CA Contact SolarEdge support 27 95 106 120 1...

Страница 59: ...use the SolarEdge Configuration Tool to change settings 34 79 80 81 Freq Too High AC L1 2 3 The frequency is above the limit permitted in this country A treated in the same manner as the error 32 35 82 83 84 Freq AC Too Low L1 2 3 The frequency is below the limit permitted in this country A treated in the same manner as the error 32 36 72 74 75 DC injection L1 2 3 DC power detected on the AC outpu...

Страница 60: ...nnection_guid e pdf N A 103 146 DC Voltage Too Low UCC Min The input voltage C is below the minimum level supported Switch off the inverter and then on again If this problem persists contact SolarEdge support N A 49 Communication error Internal Error Software If the fault persists contact SolarEdge support N A 78 SE GridMon Synch The mains voltage and frequency are unstable If the fault persists c...

Страница 61: ...to the chain If not skip to the next solution A module is directly connected to the chain without a power optimizer Verify that only power optimizers connected to the chain and that no module output is connected without a power optimizer If the problem persists proceed to the next step Failure of a power optimizers Disconnect the cables connecting the power optimizer on the chain Measure the outpu...

Страница 62: ...00 30 my CA startup current peak duration 57 5 0 6 A ms maximum fault current output 38 AT Beach Power Factor 0 9 to 1 0 Protection level class I Utility Monitoring islanding protection configurable thresholds country Yes Overvoltage category III Entrance Maximum DC power recommended3 recommended3 Module STC Module STC 2400 3300 3900 4400 5000 5500 6600 W Transformerless without grounding Yes 1 49...

Страница 63: ...tion Standards VDE AR N 4105 VDE 0126 1 1 AS 4777 DR 1663 DK 5940 emissions IEC61000 6 2 CEI61000 6 3 IEC61000 3 11 IEC61000 3 12 FCC Part 15 Class B Compliant Yes Specifications Washroom we Specifications Washroom we AC output Diameter press étoupe9 16 mm DC input 1 pair of MC4 2 pairs of MC4 Dimensions L x W x H 540 X 315 x 172 540 X 315 x 191 mm Weight 2 2 21 7 kg Cooling Natural convection Noi...

Страница 64: ...without condensation 95 Protection class Category environmental IP65 outside and inside maximum altitude 2000 M Classification Pollution Degree interior Exterior 2 3 Mounting support Support supplied 2 Available in Germany Austria and Denmark for other countries contact SolarEdge 2 Available in Germany Austria and Denmark for other countries contact SolarEdge ...

Страница 65: ...ltage range 184 to 264 5 Vac AC frequency nominal 50 60 5 Hz maximum intensity DC output per phase 6 5 8 11 5 13 14 5 16 20 23 25 5 26 AT Protection against maximum current of the overcurrent 6 5 8 11 5 13 14 5 16 20 23 25 5 26 AT residual current detector detector gradual residual current 300 30 my Supported networks three phase 3 N PE 230 400 CA startup current peak duration 154 0050 A ms maximu...

Страница 66: ...inst overvoltage III maximum efficiency of the inverter 98 European Weighted Efficiency 97 3 97 3 97 3 97 5 97 5 97 6 97 7 97 6 97 7 97 7 night consumption 2 5 W features knew Additional Features features knew Additional Features Communication Interfaces supported RS485 RS232 Ethernet ZigBee optional Compliance st andards Compliance st andards security IEC 62103 EN50178 IEC 62109 project connectio...

Страница 67: ...eaker Size fuse recommended to use the point of the SolarEdge inverter on the network connection Inverter maximum output current A Caliber Suggested fuse A sE2200 12 16 SE3000 16 5 20 SE3500 19 5 25 SE4000 22 25 SE4000 16A 16 20 SE5000 27 32 SE6000 27 32 SE4k 6 5 10 SE5k 8 10 SE7k 11 5 16 SE8k 13 16 SE9k 14 5 20 SE10k 16 20 SE12 5k 20 25 SE15k 23 25 1 For the decommissioning of power of the invert...

Страница 68: ...Appendix B Specifications SolarEdge Installation Guide MAN 01 00060 2 6 67 Inverter maximum output current A Caliber Suggested fuse A sE2200 12 16 SE16k 25 5 32 SE17k 26 32 ...

Страница 69: ...and mounting bracket The following figures show the dimensions of the inverter and the mounting brackets for the inverters single and three phase Type 1 Weight of the mounting bracket 2 87 lbs 1 3 kg Type 2 Weight Mounting Bracket 0 9 lbs 0 4 kg Single phase UPS and Type 1 mount Figure 25 Single phase inverter with a media type 1 Front and Rear view ...

Страница 70: ...echanical Specifications SolarEdge Installation Guide MAN 01 00060 2 6 69 Figure 26 Single phase inverter with a media type 1 side view and from above Figure 27 Mounting bracket of the single phase inverter Type 1 ...

Страница 71: ...ions SolarEdge Installation Guide MAN 01 00060 2 6 70 Three phase UPS and Type 1 mount Figure 28 Three phase inverter with a media type 1 Front and Rear view Figure 29 Three phase inverter with a media type 1 side view and from above ...

Страница 72: ...Appendix C Mechanical Specifications SolarEdge Installation Guide MAN 01 00060 2 6 71 Figure 30 Mounting bracket of the three phase inverter Type 1 ...

Страница 73: ...ons SolarEdge Installation Guide MAN 01 00060 2 6 72 single phase inverter and type 2 bracket Figure 31 single phase inverter with a media type 2 view of front side and rear Figure 32 Mounting bracket of the three phase inverter Type 2 ...

Страница 74: ...ions SolarEdge Installation Guide MAN 01 00060 2 6 73 three phase inverter and type 2 bracket Figure 33 Three phase inverter with a media type 2 view of front side and rear Figure 34 Mounting bracket of the three phase inverter Type 2 ...

Страница 75: ... mechanism works as follows 1 Place the ON OFF switch of the inverter at the base of the inverter OFF 1 Place the ON OFF switch of the inverter at the base of the inverter OFF or unplug the AC closing the AC breaker on the site The DC voltage on the LCD screen of the UPS starts to decrease If the AC circuit breaker was extinguished the LCD does not display In this case wait five minutes 2 When the...

Страница 76: ...If any of the following events occurs replace the fan as described below 3 If any of the following events occurs replace the fan as described below When the fan stops working Fan Status indicates Born does not work before replacing the fan turn off the AC inverter and check if the Fan Status indicates Born does not work before replacing the fan turn off the AC inverter and check if the Fan Status ...

Страница 77: ...cover 4 Open the door of the fan 4 Open the door of the fan 5 Disconnect the fan and remove the fan 5 Disconnect the fan and remove the fan Figure 36 Fan Connector 6 Connect the fan connector on the new fan 6 Connect the fan connector on the new fan 7 Close the door of the fan and tighten the cover screws 7 Close the door of the fan and tighten the cover screws 8 Check Status fan status as describ...

Страница 78: ...on the mounting bracket 7 Follow the instructions Chapter 3 Installation of the inverter and Chapter 4 Commissioning of 7 Follow the instructions Chapter 3 Installation of the inverter and Chapter 4 Commissioning of 7 Follow the instructions Chapter 3 Installation of the inverter and Chapter 4 Commissioning of 7 Follow the instructions Chapter 3 Installation of the inverter and Chapter 4 Commissio...

Страница 79: ......

Отзывы: