Chapter 6: Communication Setup
SolarEdge Installation Guide - MAN-01-00060-2.6
51
Connection Verification
1
Close the lid of the inverter (see page 24).
1
Close the lid of the inverter (see page 24).
2
Turn on the AC UPS by turning the switch on the main distribution panel.
2
Turn on the AC UPS by turning the switch on the main distribution panel.
3
Wait until the inverter connects to the SolarEdge Monitoring Portal. This can
3
Wait until the inverter connects to the SolarEdge Monitoring Portal. This can
take up to two minutes.
A status screen similar to the following screen will appear on the LCD screen:
V ac [v] V dc [v] P ac [w]
2 4 0 7 5 2 V
0, 0
<S _ OK>
OFF
S_OK:
indicates that the connection to the SolarEdge Monitoring Portal was successful. If S_OK does not appear, see
Appendix
S_OK:
indicates that the connection to the SolarEdge Monitoring Portal was successful. If S_OK does not appear, see
Appendix
S_OK:
indicates that the connection to the SolarEdge Monitoring Portal was successful. If S_OK does not appear, see
Appendix