
1. Select Communication
è
RS485-x Conf
è
Device Type
è
Multi Devices
. Select
Device 1
or
Device 2
.
2. Select Communication
è
RS485-x Conf
è
Protocol
è
SolarEdge
.
3. Select
Revenue Meter
è
Meter Func.
è
Inv. Production,
Site Production
,
Consumption
,
Export
,
Import
, or
Import
.
4. Check that the Device ID under Communication
è
RS485-
x Conf
è
Device ID is set to 1 or 2.
Number of devices is lower than configured or not dis-
played
If
<-->
or
<01>
is displayed under the ## column in the
Communication status screen shown above, at least one of the
meters is not communicating with the inverter. Check the
following:
Check the RS485 Modbus address DIP switch settings, as
specified in "Connecting Two Meters" on page 55.
The meter configuration is as described above.
There are no loose connections at the inverter connectors
and at the meters, specifically the RS485 wiring.
Meter Status Screen Troubleshooting
Refer to
Troubleshooting the Meter on page 45.
Revenue Grade Energy Meter with Modbus Connection Installation Guide MAN-01-00609-1.0
Appendix B: Installing Two Meters
65