Select
Meter Func.
and select one of the functionality
options, according to the installed meter specifications
and location.
E x p o r t + I m p o r t
E x p o r t
C o n s u m p t i o n
P r o d u c t i o n
E x t . P r o d u c t i o n
I m p o r t
N o n e
Import
: The meter is installed at the grid
connection point and reads pulses from both
directions - export and import energy.
Export
: The meter is installed at the grid connection
point and reads the export energy.
Consumption
: The meter is installed at the load
consumption point and reads the energy consumed by
the site.
Production
: The meter is installed at the inverter
output and reads the energy produced by the inverter.
Ext. Production
: The meter is used for export limitation
with 3rd party generators and for AC coupling with
non-SolarEdge inverters.
Revenue Grade Energy Meter with Modbus Connection Installation Guide MAN-01-00609-1.0
Chapter 3: Configuration
37