![SolarEdge SE-MTR240-NN-S-S1 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/solaredge/se-mtr240-nn-s-s1/se-mtr240-nn-s-s1_installation-manual_1313764020.webp)
DIP-switch inside the inverter to ON (top position). The switch is located on the
communication board and is marked SW7.
Figure 18: RS485 termination switch
To connect the RS485 wiring to the Commercial Gateway:
1. Connect to one of one of the 3-pin connectors supplied with the Commercial
Gateway to the RS485-2 connection on the Commercial Gateway.
Figure 19: Commercial Gateway RS485 connector
2. If the Commercial Gateway is at the end of the RS485 bus, terminate by switching
the SW2 termnation DIP switch to ON.
Chapter 2: Meter Installation
19
Energy Meter with Modbus Connection MAN-01-00270-1.3
Содержание SE-MTR240-NN-S-S1
Страница 1: ...Installation Guide Energy Meter with Modbus Connection For North America Version 1 3...
Страница 47: ......