Chapter 4: Installing the Battery (Optional)
Install the battery in accordance with the manufacturer instructions.
For the SolarEdge Energy Bank installation guide, see:
https://www.solaredge.com/sites/default/files/se-energy-bank-
In addition, follow these guidelines:
Make sure the battery's circuit breaker switch is OFF.
Measure the necessary length between the and the battery for all cables.
Mark polarity on DC cables.