UPS for 400 Vac Grid, Installation Guide, doc. rel. 3.0
49
39.
Set the correct last maintenance date using the
Day
,
Month
,
Year
sliders.
This will set a system maintenance reminder alarm one year from the current date.
40.
Press
Confirm
.
Finally, you must save the settings you have defined.
41.
To save the settings you defined, from the System Menu choose
Setup > Save and
restore > Save settings
.
The
Save User Settings
screen appears:
Figure 32: Confirm Save User Settings
42.
Confirm
OK
.
The User Settings are saved.
The system is now supporting the load.
3.3.6.3.
Assigning IP Address to the UPS
This procedure assigns an IP address to the UPS. Assigning an IP address allows you to remotely
monitor the UPS over an IP network.
If you do not want to remotely monitor the UPS, you can skip this step. If you
decide to later implement remote monitoring, you can perform this process
at that time.
The UPS supports use of a fixed IP address, and also supports dynamic assignment of
IP addresses (DHCP). Consult your IT systems administrator and determine if your IP network
Содержание Gamatronic B300
Страница 91: ...UPS for 400 Vac Grid Installation Guide doc rel 3 0 83 Figure 60 Connection diagram for 2 parallel units ...
Страница 92: ...84 UPS for 400 Vac Grid Installation Guide doc rel 3 0 Figure 61 Connection diagram for 4 Units in Parallel ...
Страница 95: ...UPS for 400 Vac Grid Installation Guide doc rel 3 0 87 7 1 Circuit Breaker Layout Figure 62 Electrical setup ...