Wood log boiler HVS
Main
tenance
Exhaust gas measurement
Please pay attention to the following aspect for the exhaust gas measurement:
1.
clean the boiler approx. 3 days before the measurement
2.
maybe increase the exhaust gas temperature (forced draft fan should run on full power, 100%)
3.
the buffer tank has to have enough heat capacity, thus, open all mixing and radiator valves
4.
use dry, all‐natural hard‐ and softwood in good quality with a max. residual moisture of 10–20%, the log
length has to correspond to the length of the fuel chamber, edge length approx. 8x14 cm
5.
heat up the boiler approx. 1,5 ‐ 2 hrs before the measurement to create a firebed
only fill the boiler half‐way and put more logs in when necessary
6.
compress the firebed
7.
put wood logs on the firebed, fill the fuel chamber
8.
wait for about 10 minutes
9.
start with the measurement
The sensory determined value at the boiler corresponds to the average value of the exhaust gas.
Thus, it is possible that the temperature during the measurement in the core stream of the exhaust gas might be
higher.
The test record displays the heating phase. Pay attention to the fact the a firebed has been created over a
period of 1,5 hrs before the heating phase. The exhaust gas measurement by the chimney sweeper has to
take place during the heating phase. During the heating phase the carbon monoxide value is at its lowest
point (see diagram above). This is why the measurement has to take place during the heating phase.
The exhaust gas measurement has to be carried while the boiler is operating in full load.
The forced draft fan has to run on full power (100%).
0,00
0,20
0,40
0,60
0,80
1,00
1,20
1,40
1,60
1,80
2,00
0:
00
0:
15
0:
30
0:
45
1:
00
1:
15
1:
30
1:
45
2:
00
2:
15
2:
30
2:
45
3:
00
3:
15
3:
30
CO
Ge
h
alt
in
[g
/m³]
Brenndauer
in
[h]
Messprotokoll
HVS
LC,
40
kW
CO
in
[g/m³]
CO
ab
2017
[g/m³]
Solarbayer
Mittelwert
[g/m³]
limit values from 2017 on
Solarbayer average value
Quelle: Solarba
yer
‐W
erk
smessung (Messung HV
S 40 L
C w
ähr
end der Heizphase)
Содержание HVS 100 E
Страница 13: ... Solarbayer GmbH 02 16 13 PRODUCT INFORMATION Wood log boiler HVS Installation Installation ...
Страница 25: ... Solarbayer GmbH 02 16 25 PRODUCT INFORMATION Wood log boiler HVS Operation Operation ...
Страница 41: ... Solarbayer GmbH 02 16 41 PRODUCT INFORMATION Wood log boiler HVS Maintenance Maintenance ...