PRELIMINARY DRAFT
2 System Activation and Initialization
a
.
Activate the Hybrid Power System
1. Turn on the System battery main power switches.
2. Turn on PRO-Verter User Interface.
b Set PRO-Verter clock
1. Rotate SELECT dial.
2. Press SELECT until local time is programmed.
c Set Ah Capacity (FAVS 2)
This value should be equal to the total capacity of the batteries connected to the System.
d Set AC Input Amps (FAVS 3)
This value should be equal to the current provided by the AC power source.
e Set up generator
PRO-Verter and TQG Operation
1
Press CTRL button. Rotate SELECT dial to “03 Gen Control“. Press SELECT.
2
Rotate SELECT dial until “Generator ON“ appears. Press SELECT.
i
The Remote Generator Start and Operation sequence will begin (total process
may take 3 minutes).
Note:
The audible start-warning alarms will sound when
the PRO-Verter is connected to a generator. Alarm will last 10 seconds before
generator engine start.
ii
Once generator is running, verify the LED over the AC IN 50 AMP MAX breaker is
illuminated and User Interface displays Charge mode within 90 seconds.
iii
. Verify generator remains in Charge mode for at least 5 minutes without stopping.
3
Press CTRL button. Rotate SELECT dial to “03 Gen Control“. Press SELECT.
4
. Rotate SELECT dial until “AUTO“ appears on LCD. Press SELECT.
PRO-Verter and AMMPS Generator Operation (optional)
(Optional; requires advanced Digital Control System on generator)
1
Toggle Generator Start switch on the PRO-Verter RMK (on Faceplate) to “ON“.
2
. Verify the LED above the AC IN 50 AMP MAX breaker is illuminated after the generator is
running and the LCD displays Charge mode within 90 seconds. Verify
the generator remains in charge mode for at least 5 minutes without stopping.
f Calibrate the System
1
. Allow the generator to run (in AUTO MODE) until it turns off automatically.
2
. The ESMs will be charged fully and the System will be calibrated. During normal operation
the generator runs only to charge the batteries and/or support the load; the batteries and
generator will cycle 1–2 times daily.