Solar Fabrik Professional 54 Скачать руководство пользователя страница 1

Play it safe

Installation guide solar modules

Professional
Vision

Содержание Professional 54

Страница 1: ...Play it safe Installation guide solar modules Professional Vision...

Страница 2: ...d The technical information at the time of production of the product are valid Solar Fabrik AG Freiburg 2014 DIN EN ISO 9001 Quality management system DIN EN ISO 14001 Environmental management system...

Страница 3: ...Professional Vision 3 Vision 54 frameless Professional 60 Vision 60 Professional 54 1408TU0710 Installation guide...

Страница 4: ...reme Danger due to electrical shock Solar modules generate electricity When exposed to light a voltage occurs which can be dangerous and life threatening Even though the individual modules generate a...

Страница 5: ...ss are approved for operation in installations with unrestricted access Professional and Vision modules from Solar Fabrik AG which are qualified under EN 61730 and have been properly installed meet th...

Страница 6: ...carry out a proper grounding If an external lightning protection system has been already installed the PV system has to be integrated in the existing lightning protection concept by a specialist Count...

Страница 7: ...hen turn the screw another quarter or half turn The thread cutting screw should be torqued by 20 4 lb in and 24 8 lb in 2 3 and 2 8 Nm J J Wire placement Insert the cable into the wire slot Then push...

Страница 8: ...taken that the module is not exposed to any negative mechanical or electrical influence from other system components Only connect modules with the same rated current in series and modules with the sa...

Страница 9: ...n of heat with adverse effects on the performance can be avoided J J Secure attachment To ensure that modules are installed correctly make sure to securely attach the modules at least four points Fram...

Страница 10: ...Vision 60 L C 3 990 340 400 340 400 1677 240 240 500 240 240 500 240 240 1000 Vision 60 Professional 54 L C 3 990 1503 210 210 460 210 210 460 240 240 1000 Professional 54 1408TU0710 Installing the m...

Страница 11: ...modules from the back example B using the provided attachment holes Use a torque wrench for installation The required tightening torque for the above samples is 14 8 lb ft 20 Nm Use M6 bolts made of V...

Страница 12: ...der to minimize the voltage drop For further connections of the modules only appropriate cables with a minimum conductor cross section of 4 mm must be used J J Protect the wires from adverse environme...

Страница 13: ...of automatic cleaning machines for solar energy systems is at your own risk and is not authorised by Solar Fabrik AG in any way Inspect the installation on a regular basis and check it for X X secure...

Страница 14: ...Professional Vision 14 1408TU0710 Notes...

Страница 15: ...Professional Vision 15 1408TU0710...

Страница 16: ...Play it safe Solar Fabrik AG Munzinger Str 10 79111 Freiburg Deutschland Telefon 49 0 761 4000 0 Telefax 49 0 761 4000 199 www solarfabrik de Status 07 08 2014 Document number 1408TU0710...

Отзывы: