
185
25. ROUTE SURVEYING
5. Set the base point (BP).
Input the coordinate for the BP, and
press
[NEXT]
.
6. Set the IP 1.
Input the coordinate for the IP 1, and
press
[NEXT]
.
7. Set the following IPs.
Input the following IPs in the same
manner as step 6. To define the input
IP as the end point (EP), press
[EP]
.
8. Check the EP.
Check the coordinate for the EP, and
press
[OK]
.
9. Quit inputting the IPs.
Press
[OK]
in the screen shown in step
8.
The screen returns to <Curve Element
Setting>.
25.8.2 Inputting Curve Elements
• Automatic setting of the BP (step 3): You can set the BP for the next curve as
the IP or the EP for the previous curve (KA-2 or the EC point) in advance.
• If multiple curves overlap when the next curve is calculated based on the input
curve elements (when
[OK]
is pressed), the screen below is displayed.
N p :
E p :
B P
1 0 0 . 0 0 0
1 0 0 . 0 0 0
REC
LOAD
NEXT
N p :
E p :
I P 1
2 0 0 . 0 0 0
2 0 0 . 0 0 0
REC
LOAD
NEXT
N p :
E p :
I P 3
4 0 0 . 0 0 0
2 0 0 . 0 0 0
REC
LOAD
NEXT
EP
N p :
E p :
E P
4 0 0 . 0 0 0
<Curve number:2>
2 0 0 . 0 0 0
OK
1 m m
C u r v e o v e r l a p
C o n t i n u e ?
Element 2- Element3
YES
NO
Содержание CX-101
Страница 2: ... This is the mark of the Japan Surveying Instruments Manufacturers Association Li ion S Li ion ...
Страница 10: ...viii ...
Страница 318: ...39 REGULATIONS 308 ...
Страница 320: ......
Страница 321: ......