
SOFAR 3.3K~12KTL-X
User manual
All rights reserved
©
Shenzhen SOFARSOLAR Co ., Ltd.
- 10 -
3. Installation
3.1. Installation Process
Figure3-1 Installation flowchart
3.2. Checking Before Installation
Checking Outer Packing Materials
Packing materials and components may be damaged during transportation.
Therefore, check the outer packing materials before installing the inverter.
Checking the surface of packing materials for damage, such as holes and
cracks. If any damage is found, do not unpack the inverter and contact the
dealer as soon as possible. You are advised to remove the packing materials
within 24 hours before installing the inverter.
Checking Deliverables
After unpacking the inverter, check whether accessories are intact and
complete. If any damage is found or any component is missing, contact the
dealer.
Table3-1 shows the components and mechanical parts that should be delivered
No.
Pictures
Quantity
Description
1
1PCS
SOFAR 3.3K~12KTL-X
2
1PCS
Rear panel