![SNR SNR-S212i-8POE Series Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/snr/snr-s212i-8poe-series/snr-s212i-8poe-series_installation-manual_1310631041.webp)
SNR-S212i-8POE Installation Guide
Hardware installation
Shop.Nag.Ru 2016
31
Item
Requirements
Backup power module
A backup power module is recommended, which can supply
power in case of power failure.
Power supply
The power supplied by the power module must be greater than
the maximum power consumption.
4.1.3 Static electricity conditions
To prevent bodily static electricity from damaging the SNR-S212i-8POE, wear the Anti-Static
Discharge (ASD) wrist properly any time when you contact the SNR-S212i-8POE, with the
other end of the ASD wrist well grounded.
4.1.4 Grounding conditions
The switch must be grounded, and the grounding resistance should be no smaller than 1 .
Well grounding is the first guarantee to lightning protection and anti-interference.
4.1.5 Other conditions
Before installing the SNR-S212i-8POE, check whether auxiliary parts are ready. For example,
ensure that cables and supporting devices are properly installed.
4.2 Installing device
4.2.1 Guide-rail installation
When you take the SNR-S212i-8POE from the package, it is installed with a guide-
rail kit at its rear panel.
Install the SNR-S212i-8POE on the guide rail as below:
Step 1
Hang the sliding connector on the guide rail.
Содержание SNR-S212i-8POE Series
Страница 1: ...SNR S212i 8POE Installation Guide...