background image

2. 

Operation & Specifications

2 - 17

DAILY PREVENTATIVE MAINTENANCE CHECKLIST

Daily preventative maintenance will prevent abnormal wear and prolong the life of all 

systems. The inspection & maintenance schedule should be performed at the specified 

intervals.
Inspection and maintenance shall be performed by personnel who are trained and familiar 

with mechanical and electrical procedures.

!

!

Before performing preventative maintenance, familiarize yourself with 

the operation of the machine.
Always block the elevating assembly whenever it is necessary to perform 

maintenance while the platform is elevated.

W A R N I N G

This Daily checklist has been designed for machine service and maintenance. Please 

photocopy this page and use the checklist when inspecting the machine.

MAINTENANCE TABLE KEY

Y

 = Yes/Acceptable

N

 = No/Not Acceptable

R

 = Repaired/Acceptable

PREVENTATIVE MAINTENANCE REPORT

Date: _______________________________

Owner: _____________________________

Model No: __________________________

Serial No: ___________________________

Serviced By: _________________________

COMPONENT

INSPECTION OR SERVICE

Y N R

BATTERY

Check electrolyte level.

Check battery cable condition.

CHASSIS

Check hoses for pinch or rubbing points.

Check welds for cracks.

CONTROL CABLE

Check the exterior of the cable for pinching, binding or 

wear.

CONTROLLER

Check switch operation.

DRIVE MOTORS

Check for operation and leaks.

ELEVATING ASSEMBLY

Inspect for structural cracks.

EMERGENCY LOWERING

SYSTEM

Operate the emergency lowering valve & check for 

serviceability.

ENTIRE UNIT

Check for and repair collision damage.

HYDRAULIC FLUID

Check fluid level.

HYDRAULIC PUMP

Check for hose fitting leaks.

HYDRAULIC SYSTEM

Check for leaks.

LABELS

Check for peeling, missing, or unreadable labels & replace.

PLATFORM DECK AND 

RAILS

Check welds for cracks.

TYRES AND WHEELS

Check for damage.

Table 1: 

Daily Maintenance Checklist

Содержание MB20J

Страница 1: ...JANUARY 2018 01 00054 MB20 01 00071 MB26...

Страница 2: ......

Страница 3: ...L NUMBER is also stamped on top of the chassis above the front axle pivot Nameplate The Work Platform Nameplate is located externally at the FRONT of the chassis When contacting Snorkel for service or...

Страница 4: ......

Страница 5: ...ating See Beaufort Scale on page 1 for details NEVER attach notice boards etc to the platform as this will increase wind loading IN CASE OF EMERGENCY push EMERGENCY STOP switch to deactivate all power...

Страница 6: ...NOTES...

Страница 7: ...2 9 ELEVATING LOWERING THE WORK PLATFORM 2 9 TRAVEL WITH WORK PLATFORM LOWERED 2 10 TRAVEL WITH WORK PLATFORM ELEVATED 2 10 EMERGENCY SITUATIONS 2 11 EMERGENCY LOWERING BY HAND 2 11 Figure 8 Emergenc...

Страница 8: ...ratures and conditions ranging between 50c to 20c SCOPE This manual includes the procedures and responsibilities for the inspection transportation safe operation maintenance and repair of this product...

Страница 9: ...arm level It features a deadman enable button and selector buttons to provide pre programmed speeds for all functions except drive and steering This control station is used primarily for service type...

Страница 10: ...e is limited by the pre programmed speed setting on the motor but is determined by the position of the joystick in the Upper Control Box 1 3 WORKSHOP PROCEDURES All information contained in this manua...

Страница 11: ...he machine when wind speeds exceed 12 5m s 28 m p h Beaufort scale 6 BEAUFORT RATING WIND SPEED GROUND CONDITIONS M S KM H FT S M P H 3 3 4 5 4 12 25 19 4 11 5 17 75 7 5 12 0 Papers and thin branches...

Страница 12: ...ach over obstacles but must be used on firm and level ground at all times DO NOT use the lifting mechanism to raise or lower goods or persons except within the cage and subject to the specified weight...

Страница 13: ...with the machine to fill the batteries to the correct electrolyte level This is done by locating the battery topup valve behind the mast cover inspection door refer to figure 3 and connecting it to t...

Страница 14: ...Control Station 8 Check mast chains by elevating the masts approximately 30cm above the rest position Check for correct routing of the energy chain Raise the masts to full height and check for correc...

Страница 15: ...0 control module To check it s operation while in platrom drive the machine onto a suitable ramp to raise it s tilt angle above 2 degrees lift the Jib until the jib limit switch just separates a conti...

Страница 16: ...cluding pre operation inspection It should never be used to position a manned or un maned platform NOTE It may be used in the event of emergency to lower the manned platform The issue of reduced speed...

Страница 17: ...ON 4 STEERING SWITCH 5 SELECTOR SWITCH 6 MAST SELECT BUTTON 7 LOW HIGH TORQUE SELECTOR 8 HORN 2 DEADMAN GRIP 9 LOW BATTERY WARNING CONTROL FUNCTIONS Table 1 Platform Controls and Indicators ITEMS NAME...

Страница 18: ...y charge is low and machine automatically switches into limp mode 10 Overload warning lamp Illuminates when load in basket exceeds SWL Table 2 Lower controls and Indicators LOWER CONTROL PANEL ITEMS N...

Страница 19: ...t is imperative that the pre operation Safety Inspection has been completed and any deficiencies have been corrected The operator must also be fully trained in the use of this machine Before beginning...

Страница 20: ...sure that the drop bar is in position 4 Check that the route is clear of persons obstructions pot holes or ledges and is capable of supporting the wheel loads Also check that the clearances above belo...

Страница 21: ...d to lower the platform using the emergency lowering valves Lower the mast structure before lowering the jib platform structure NOTE Lower the masts fully before lowering the jib structure Figure 8 Em...

Страница 22: ...lock ballast from the machine Remove the 13 screws connecting the ballast cover to the mast Undo the 4 bolts connecting the ballast to the mast and use a forklift to remove the ballast block The balla...

Страница 23: ...RANE The MB20 26J may be lifted by an overhead hoist crane subject to the following strict procedure Raise the jib to clear the lifting straps as shown Use 4 separate lifting straps connected to a spr...

Страница 24: ...e made secure by 1 Chocking the wheels 2 Securing with adequate chains or straps to the lifting lugs on the chassis Figure 5 Securing the Platform TOWING WINCHING VALVES The fail safe brakes are autom...

Страница 25: ...ass of a slow moving machine W A R N I N G 2 6 AFTER USE STORAGE AFTER USE EACH DAY 1 Ensure that the platform masts and jib are fully lowered 2 Park the machine on firm and level ground never on a gr...

Страница 26: ...mast and jib mount area as a minimum This will prevent moisture from entering the mast battery and chassis areas Figure 3 Battery Disconnect Battery Disconnect switch BATTERIES 1 Disconnect the batter...

Страница 27: ...Acceptable PREVENTATIVE MAINTENANCE REPORT Date _______________________________ Owner _____________________________ Model No __________________________ Serial No ___________________________ Serviced...

Страница 28: ...bs Maximum Drive Speed Stowed 3 30 km h 2 05mph Maximum Drive Speed Elevated 0 60km h 0 37mph Maximum Gradeability 25 25 Outside Turning Radius 1 90m 6 23ft Electrical Power Source 4 x 6V 375Ah Batter...

Страница 29: ...aximum Drive Speed Stowed 3 13 km h 1 94mph Maximum Drive Speed Elevated 0 60km h 0 37mph Maximum Gradeability 25 25 Outside Turning Radius 1 93m 6 33ft Electrical Power Source 4 x 6V 375Ah Battery 4...

Страница 30: ...2 Operation Specifications 2 20 NOTES...

Страница 31: ......

Страница 32: ...A ASIA PHONE 44 0 845 1550 057 FAX 44 0 845 1557 756 NORTH SOUTH AMERICA PHONE 1 785 989 3000 TOLL FREE 1 800 225 0317 FAX 1 785 989 3070 AUSTRALIA PHONE 61 2 9725 4000 FAX 61 2 9609 3057 NEW ZEALAND...

Отзывы: