background image

2. 

Operation & Specifications

2 - 9

 

Figure 4: Lower Control Panel

1. Emergency Stop

2. KeySwitch - Platform Controls

- OFF 

- Lower Controls

3. Analogue Rocker
4. Selector Switch - Jib

- Mast 
- Mast Rotate

5. Enable Switch
6. Ez 230 Display

TYPICAL OPERATION

Raising the mast.
• The Keyswitch must be turned to lower controls (2). 
• Select Mast using the selector switch (4) 
• Press up and hold the switch (5), 
• Activate the Rocker Switch (2) in the direction required.

ELEVATING & LOWERING THE WORK PLATFORM

Before operating the MB20/26J Work Platform it is imperative that the pre-operation Safety 

Inspection has been completed and any deficiencies have been corrected. The operator must 

also be fully trained in the use of this machine.

Before beginning any operation, the following checks should be carried out.

NOTE:

 Chassis controls are for service use only. 

!

!

ENSURE

 that no other persons are within 1 metre of the machine. 

Be aware of the pothole protection bar hazard on both sides of the 

machine.

LOOK

 up and around for obstructions before performing the lift or 

drive functions.

DO NOT

   overload the platform.

DO NOT

   operate near electrical power cables, keep within national  

safety limits.

THIS WORK PLATFORM IS NOT ELECTRICALLY INSULATED.

W A R N I N G

1

6

3

2

5

4

Содержание MB20J

Страница 1: ...JANUARY 2018 01 00054 MB20 01 00071 MB26...

Страница 2: ......

Страница 3: ...L NUMBER is also stamped on top of the chassis above the front axle pivot Nameplate The Work Platform Nameplate is located externally at the FRONT of the chassis When contacting Snorkel for service or...

Страница 4: ......

Страница 5: ...ating See Beaufort Scale on page 1 for details NEVER attach notice boards etc to the platform as this will increase wind loading IN CASE OF EMERGENCY push EMERGENCY STOP switch to deactivate all power...

Страница 6: ...NOTES...

Страница 7: ...2 9 ELEVATING LOWERING THE WORK PLATFORM 2 9 TRAVEL WITH WORK PLATFORM LOWERED 2 10 TRAVEL WITH WORK PLATFORM ELEVATED 2 10 EMERGENCY SITUATIONS 2 11 EMERGENCY LOWERING BY HAND 2 11 Figure 8 Emergenc...

Страница 8: ...ratures and conditions ranging between 50c to 20c SCOPE This manual includes the procedures and responsibilities for the inspection transportation safe operation maintenance and repair of this product...

Страница 9: ...arm level It features a deadman enable button and selector buttons to provide pre programmed speeds for all functions except drive and steering This control station is used primarily for service type...

Страница 10: ...e is limited by the pre programmed speed setting on the motor but is determined by the position of the joystick in the Upper Control Box 1 3 WORKSHOP PROCEDURES All information contained in this manua...

Страница 11: ...he machine when wind speeds exceed 12 5m s 28 m p h Beaufort scale 6 BEAUFORT RATING WIND SPEED GROUND CONDITIONS M S KM H FT S M P H 3 3 4 5 4 12 25 19 4 11 5 17 75 7 5 12 0 Papers and thin branches...

Страница 12: ...ach over obstacles but must be used on firm and level ground at all times DO NOT use the lifting mechanism to raise or lower goods or persons except within the cage and subject to the specified weight...

Страница 13: ...with the machine to fill the batteries to the correct electrolyte level This is done by locating the battery topup valve behind the mast cover inspection door refer to figure 3 and connecting it to t...

Страница 14: ...Control Station 8 Check mast chains by elevating the masts approximately 30cm above the rest position Check for correct routing of the energy chain Raise the masts to full height and check for correc...

Страница 15: ...0 control module To check it s operation while in platrom drive the machine onto a suitable ramp to raise it s tilt angle above 2 degrees lift the Jib until the jib limit switch just separates a conti...

Страница 16: ...cluding pre operation inspection It should never be used to position a manned or un maned platform NOTE It may be used in the event of emergency to lower the manned platform The issue of reduced speed...

Страница 17: ...ON 4 STEERING SWITCH 5 SELECTOR SWITCH 6 MAST SELECT BUTTON 7 LOW HIGH TORQUE SELECTOR 8 HORN 2 DEADMAN GRIP 9 LOW BATTERY WARNING CONTROL FUNCTIONS Table 1 Platform Controls and Indicators ITEMS NAME...

Страница 18: ...y charge is low and machine automatically switches into limp mode 10 Overload warning lamp Illuminates when load in basket exceeds SWL Table 2 Lower controls and Indicators LOWER CONTROL PANEL ITEMS N...

Страница 19: ...t is imperative that the pre operation Safety Inspection has been completed and any deficiencies have been corrected The operator must also be fully trained in the use of this machine Before beginning...

Страница 20: ...sure that the drop bar is in position 4 Check that the route is clear of persons obstructions pot holes or ledges and is capable of supporting the wheel loads Also check that the clearances above belo...

Страница 21: ...d to lower the platform using the emergency lowering valves Lower the mast structure before lowering the jib platform structure NOTE Lower the masts fully before lowering the jib structure Figure 8 Em...

Страница 22: ...lock ballast from the machine Remove the 13 screws connecting the ballast cover to the mast Undo the 4 bolts connecting the ballast to the mast and use a forklift to remove the ballast block The balla...

Страница 23: ...RANE The MB20 26J may be lifted by an overhead hoist crane subject to the following strict procedure Raise the jib to clear the lifting straps as shown Use 4 separate lifting straps connected to a spr...

Страница 24: ...e made secure by 1 Chocking the wheels 2 Securing with adequate chains or straps to the lifting lugs on the chassis Figure 5 Securing the Platform TOWING WINCHING VALVES The fail safe brakes are autom...

Страница 25: ...ass of a slow moving machine W A R N I N G 2 6 AFTER USE STORAGE AFTER USE EACH DAY 1 Ensure that the platform masts and jib are fully lowered 2 Park the machine on firm and level ground never on a gr...

Страница 26: ...mast and jib mount area as a minimum This will prevent moisture from entering the mast battery and chassis areas Figure 3 Battery Disconnect Battery Disconnect switch BATTERIES 1 Disconnect the batter...

Страница 27: ...Acceptable PREVENTATIVE MAINTENANCE REPORT Date _______________________________ Owner _____________________________ Model No __________________________ Serial No ___________________________ Serviced...

Страница 28: ...bs Maximum Drive Speed Stowed 3 30 km h 2 05mph Maximum Drive Speed Elevated 0 60km h 0 37mph Maximum Gradeability 25 25 Outside Turning Radius 1 90m 6 23ft Electrical Power Source 4 x 6V 375Ah Batter...

Страница 29: ...aximum Drive Speed Stowed 3 13 km h 1 94mph Maximum Drive Speed Elevated 0 60km h 0 37mph Maximum Gradeability 25 25 Outside Turning Radius 1 93m 6 33ft Electrical Power Source 4 x 6V 375Ah Battery 4...

Страница 30: ...2 Operation Specifications 2 20 NOTES...

Страница 31: ......

Страница 32: ...A ASIA PHONE 44 0 845 1550 057 FAX 44 0 845 1557 756 NORTH SOUTH AMERICA PHONE 1 785 989 3000 TOLL FREE 1 800 225 0317 FAX 1 785 989 3070 AUSTRALIA PHONE 61 2 9725 4000 FAX 61 2 9609 3057 NEW ZEALAND...

Отзывы: