84
5-36
5-37
5-38
5-39
5-40
26
26
Operation
Figure 5-36
OPTIMISATION “
OP.2
”
START is signalled on the screen.
—
Perform a measuring run.
A compensation run is performed.
The OPTIMISATION “OP.3” screen is displayed
(
Fig.
5-37
).
Figure 5-37
OPTIMISATION “
OP.3
”
—
Mount the tyre correctly on the rim (follow the
centring line) and inflate to specified inflation
pressure.
—
Confi rm by pressing menu key
26
.
The OPTIMISATION “OP.4” screen is displayed
(
Fig.
5-38
).
Figure 5-38
OPTIMISATION “
OP.4
”
(fi rst measuring run with tyre)
—
Clamp the wheel on the balancer.
—
Position the valve so that it is exactly perpendicular
to and above the chuck.
—
Confi rm the valve position by pressing menu key
26
.
The OPTIMISATION “OP.5” screen is displayed (
Fig.
5-39
).
Figure 5-39
OPTIMISATION “
OP.5
”
START is signalled on the screen.
—
Perform a measuring run.
A measuring run is performed.
The OPTIMISATION “OP.6” screen is displayed (
Fig.
5-40
).
Содержание Sun SWB 340
Страница 142: ...142 Blank Page...