10.0 FINAL PROCEDURES
10.1
Check of Assembled Lift
1. Final dimension check after anchoring.
2. Check for air and hydraulic leaks.
3.
Check hydraulic fluid level in reservoir and top up
as required using appropriate fluid.
4. Check all fasteners, tighten if necessary.
5. Check torque of anchor bolts (Section 7.12)
6. Operate lift to full stroke then lower to ground while checking
for proper functionality. Ensure Safety Release is operational.
7. Ensure Customer Care Kit is complete and given to operator.
a. Operation
Manuals (Lift and Jacking beam)
b. ANSI / ALI Lift It Right Manual
c. ANSI / ALI Safety Tip Card
d. ANSI / ALI ALIS Safety Requirements for Installation
and Service of Automotive Lifts
e. ANSI / ALI Quick Reference Guide
8. Ensure Oil has been added to th
e Filter / Regulator / Lubricator (Section 7.7)
9.
Bleeding and equalization procedure completed
.
10. Train end user on operation of lift.
10.2
Operation Test with Vehicle
1. Lower lift to the ground.
2. Drive vehicle on to lift and
Chock the vehicle in position.
3. Raise the lift, and lower onto 3-4 different locking positions until the
full lifting height is reached. Check that all locks are working correctly.
4. Lower lift to the ground and drive vehicle off lift.
If any problems occur during the final checkout or operation of the lift please contact
customer service at 1-800-225-5786.
Содержание EELR501A
Страница 6: ...6 of 73 2 0 SAFETY WARNING DECALS...
Страница 8: ...8 of 73 Figure 2 Lift Dimensions Side View Figure 3 Lift Dimensions Back View...
Страница 18: ...18 of 73 Figure 12 Hydraulic Connections...
Страница 33: ...33 of 73 Figure 31 Connection of Air Recoil Hose...
Страница 61: ...61 of 73 16 0 HYDRAULIC AND AIR LINE ASSEMBLY 16 1 Hydraulic Line Routing Map Figure 51 Hydraulic Items Map...
Страница 64: ...64 of 73 16 6 Air Line Routing Map Figure 53 Air Hose Assembly...
Страница 69: ...69 of 73 17 5 Console Labeling Figure 57 Console Labeling...
Страница 74: ...74 of 73 APPENDIX Foundation Plan...