Instructions for the installer
26
For operation on 380-415V3N :
use an H05RR-F / H05RN-F /
H05V2V2-F type five-core cable (5 x 2.5 mm
2
).
For operation on 380-415V2N :
use an H05RR-F / H05RN-F /
H05V2V2-F type five-core cable (cavo di 4 x 4 mm
2
).
For operation on 220-240V :
use an H05RR-F / H05RN-F /
H05V2V2-F (cavo di 3 x 6 mm
2
).
The earth wire (yellow-green) must be at least 20 mm longer than
the other wires at the end for connection to the appliance.
WARNING:
The values indicated above refer to the cross-section of the internal conductor.
THE MANUFACTURER DECLINES ALL RESPONSIBILITY FOR DAMAGE TO PERSONS OR THINGS
CAUSED BY NON-OBSERVANCE OF THE ABOVE PRESCRIPTIONS.
15.2 Positioning and levelling the appliance (depending on model)
After making the electrical connections, level the appliance on the ground by means of its four adjustable
feet. For good cooking results, the appliance must be properly levelled. Depending on the model you
have purchased, the foot height adjustment range may vary from 70 to 95 mm and from 110 to 160 mm.
These heights refer to the distance between the highest point of the foot (fixed part) and the lowest point
(movable part which rests on the floor).
15.3 Wall fixing
1 Fix the screw to the wall and hook the chain
(B)
;
2 Hook the chain to the hole positioned at the rear of the cooker by the gas pipe
(A)
;
3 Once the chain is in position, push the cooker against the wall;
4. The height of the screw hole from floor level must not exceed 800 mm
(C)
.
A
B
C
Содержание CE9CMXA
Страница 25: ...Instructions for the installer 27...
Страница 26: ...Instructions for the installer 28...
Страница 27: ......
Страница 28: ...914773855 A...