Drive Startup Manual KEB-PM
August 23,2019
©2019 Smartrise Engineering, Inc. All Rights Reserved
Page 5
Figure 4: Example of Construction Wiring
Powering Up
Perform the following to power up the drive.
Apply external power by closing the main disconnect.
Close the two-pole breaker and all pushbutton breakers.
Содержание KEB-PM
Страница 1: ......
Страница 2: ...Page intentionally left blank...