TTDZ User manual
Description
Device
Package Contents
1 TTDZ digital head
1 Manual
1 Coupling Ring
3 Adapters (Danfoss RA, RAV, RAVL)
1 Lock / unlock tool
1. Inserting batteries
1. Open the battery compartment
2. Insert the batteries (matching the polarity)
3. Close the battery compartment
The LED lights up, make sure the piston is fully retracted, and
the adjustment has completed.
2. Inclusion of the device
a) Automatic inclusion
Please note that after inserting the batteries, the device remains
in automatic inclusion mode for about 2 minutes. Exceeding this
time, you will not be able to include it in this way.
1. Put the gateway into inclusion mode and then immediately in
-
sert the batteries.
2. After a few seconds the LED will turn on (red, then flickering
green) and the device will appear on the APP.
3. Mount the TTDZ valve within 1 minute and quickly press the
button once to install the device.
4. The LED goes out, the device performs the adaptation proce
-
dure.
N.B.
If the LED does not go out, press the button again quickly.
5. Change the name of the device for easy identification
b) Manual Inclusion
If you failed to include the device in automatic mode, proceed as
follows, to include it in the manual mode.
1. Put the gateway into inclusion mode.
2. Press the button on the device when the APP displays the re
-
quest, with the tool provided, for 5 or more seconds and release
when the LED becomes fixed for 2 seconds.
3. The LED should then flash green.
4. Mount the head on the valve when the piston is in its installed
position, ie fully up and stopped.
5. Press the button once quickly to install the device.
6. The LED goes out, the device performs the adaptation pro
-
cedure.
Button
(A)
Lo
ck
/u
nl
ock
t
oo
l
N.B.
If the LED does not go out, press the device button again
quickly.
If you failed to include the device, exclude it, even if it not pre
-
sent on the APP, and then re-include it.
3. Exclusion of the device
To exclude the device from your gateway proceed as follows.
1. Put the gateway into exclusion mode.
2. Press the button on the device when the APP displays the
request, with the tool provided, for 5 or more seconds, and
release when the LED becomes fixed for 2 seconds.
3. After a short time the head should disappear from the APP.
4. The LED blinks.
5. Remove the batteries.
N.B.
If you failed to exclude (remove) the device from your
gateway retry the operation or contact technical support.
4. Assembly
The installation is quick and easy and you can attach directly to
most thermostatic valves available with M30 * 1.5. Installation
does not need any intervention because the hot water circuit is
not interrupted and you will not need to drain the system.
1. If necessary, identify an appropriate adapter and attach it to
the valve.
2. Screw the coupling ring (white) firmly on the valve or
adapter.
3. Place the TTDZ ring and push it until it
snaps into place.
N.B. Do not start the process of adaptation before
mounted TTDZ to the coupling ring.
Radiator Valve – [adaproe] – Coupling ring – TTDZ
LED
red/green
Rev.06/2015
P/N 01335-1014-00
SmartDHOME Srl
www.ecodhome.com
For United Kingdom and Ireland only, refer to:
www.ecodhome.co.uk