24
PCIE-6001 Installation and Use (6806800U73B)
Hardware Preparation and Installation
Hardware Preparation and Installation
Any optional items ordered.
2.
Check your shipment and report any damage or differences via the SMART EC support
page at
https://www.smartembedded.com/ec/support/.
3.
Remove the desiccant bag shipped with the card and dispose it according to your
country’s legislation.
2.3
Environmental, Thermal, and Power
Requirements
This section contains the environmental, thermal, and power requirements of the
PCIE-6001 card.
M2.5 shoulder screw
M2.5 screw
Standoff
Top View
Side View
Make sure the card is thoroughly inspected before shipment. If any damage has
occurred during transportation please contact our Contact Center immediately.
Содержание PCIE-6001
Страница 1: ...PCIE 6001 Installation and Use P N 6806800U73B December 2019 ...
Страница 6: ...List of Figures 6 PCIE 6001 Installation and Use 6806800U73B ...
Страница 8: ...List of Tables 8 PCIE 6001 Installation and Use 6806800U73B ...
Страница 12: ...12 PCIE 6001 Installation and Use 6806800U73B About this Manual About this Manual ...
Страница 18: ...18 PCIE 6001 Installation and Use 6806800U73B Sicherheitshinweise Sicherheitshinweise ...
Страница 22: ...22 PCIE 6001 Installation and Use 6806800U73B Introduction Introduction ...
Страница 36: ...36 PCIE 6001 Installation and Use 6806800U73B Functional Description Functional Description ...
Страница 46: ......
Страница 47: ...1 ...