12 Decommissioning the Inverter
To decommission the inverter completely upon completion of its service life, proceed as described
in this Section.
CAUTION
Risk of injury due to weight of product
Injuries may result if the product is lifted incorrectly or dropped while being transported or
mounted.
• Transport and lift the product carefully. Take the weight of the product into account.
• Wear suitable personal protective equipment for all work on the product.
Procedure:
1.
DANGER
Danger to life due to high voltages
• Disconnect the inverter from all voltage sources (see Section 9, page 69).
2.
CAUTION
Risk of burns due to hot enclosure parts
• Wait 30 minutes for the enclosure to cool down.
3. Unscrew the RS485 plug and pull it out of the jack.
2
1
RS485
4. Screw the protective cap onto the RS485 jack.
RS485
5. Unscrew the swivel nut from the threaded sleeve for
the network cable.