Installation Guide
Connecting the AC Output with PG13.5
To connect a cable with a maximum cross-section of 13.5 mm², proceed as follows.
1.
Press the sealing ring (1) into the cord grip (2).
2.
Now slide the pressure screw (3) over the cable
first of all, followed by the cord grip with the sealing ring (4) in it. Now slide the
threaded sleeve (5) over the cable.
3.
Now connect the individual conductors to the socket element in sequence.
- Protective earth PE (green/yellow) to the
screw terminal with the earth sign.
- Neutral conductor N (blue) to screw terminal
1.
- Live L (brown or black) to screw terminal 2.
- Terminal 3 remains unused.
4.
Make sure the wires (6) are securely
connected.
(1)
(2)
(3)
(4)
(5)
PE
N
L
(6)
Содержание Sunny Boy SB 2500
Страница 2: ......
Страница 6: ...Explanation of the Symbols Used SMA Technologie AG Page 6 SB25_30 11 SE0307 Installation Guide...
Страница 10: ...Safety Instructions SMA Technologie AG Page 10 SB25_30 11 SE0307 Installation Guide...
Страница 20: ...Installation Requirements SMA Technologie AG Page 20 SB25_30 11 SE0307 Installation Guide...
Страница 34: ...Opening and Closing the Sunny Boy SMA Technologie AG Page 34 SB25_30 11 SE0307 Installation Guide...
Страница 58: ...Rating for a Line Circuit Breaker SMA Technologie AG Page 58 SB25_30 11 SE0307 Installation Guide...
Страница 62: ...The Communication Interface SMA Technologie AG Page 62 SB25_30 11 SE0307 Installation Guide...
Страница 65: ......