
INSTALLATION
19
© SMA Solar Technology AG Subject to changes to the technical content! Version 1.1 Last updated 04/2021
6 Installation
6.1 Disassembly and assembly of the cabinet
Remove the packaging and transport safeguards from the cabinet. The cabinet consists of two halves that are
connected to each other. If necessary for transporting the cabinet to the installation location, the cabinet can be
quickly and easily divided into two halves.
1
First, remove the transport safeguards. To do this, remove the cross-head
screws that connect the cabinet feet on the right and left sides of the
cabinet to the pallet.
2
Then, attach the side cover panels in the base area of the storage sys-
tem using two M 6 x 16 screws.
11 .4
3
Now, disassemble the cabinet connections by removing the six cross-
head screws at the marked points.
4
Remove the crane brackets
1 .2
. The cabinet halves are now separated
and can be moved to the installation location. Connect the cabinet
halves in the reverse order of disassembly described in steps
1
to
3
.
Place the cabinet in its final position pursuant to the specifications for the
installation location in section “3.4 Installation location“ on page 12.
Содержание STORAGE-67-TS-10
Страница 1: ...ENGLISH STORAGE 67 TS 10 Version 1 1 Installation and Operating Instructions STORAGE 67 TS 10...
Страница 51: ......
Страница 52: ...www SMA Solar com...