SMA SCHOOLMETERBOX Скачать руководство пользователя страница 19

SMA Solar Technology AG

Channel List

Installation Guide

SMETER-IEN084710

19

10 Channel List

10.1 Spot values

Spot values can only be read and not changed.

10.2 Parameters

Spot values

Channel

Description

m_OpTM

Shows the number of hours in operation which the Schoolmeterbox has run 
since commissioning.

m_Pac

Shows the computed spot value for the power output.

m_ResetCount

Shows the number of resets (restarts) of the Schoolmeterbox.

m_S0 Count

Shows the number of consumption meter impulses.

m_S0 kWh

Shows the power consumption in kWh.

Parameters

Channel

Description

s_DevNam

Here, you can enter a name for the Schoolmeterbox. The following 
symbols can be used: A-Z, a-z, 0-9, _ , - , +, * , #, (space)
Unrecognized symbols will be replaced by a space.

*s_DevRs

With this channel, you can carry out a reset (restart) of the 
Schoolmeterbox. The value of this channel is always "0". To carry out a 
reset, enter the value "1" and save it. At this moment the Schoolmeterbox 
carries out a reset. The value for the channel is set back to "0". 

s_FwVer

Shows the firmware version of the Schoolmeterbox.

s_HwVer

Shows the hardware version of the Schoolmeterbox.

s_SN

Shows the serial number of the Schoolmeterbox.

*u_S0 Edge

Here you can set whether the Schoolmeterbox should evaluate the 
ascending or descending edge of the consumption meter signal.

*u_S0 Impuls/kWh

You have to enter the number of consumption meter impulses per kWh 
here.

u_S0 Offset

You have to enter the consumption meter counter reading here. The 
Schoolmeterbox counter reading has to be matched to that of the 
consumption meter, so that the Schoolmeterbox has the same initial 
reading. You must enter the counter reading times one hundred (for 
example, to get 10.25 kWh, you have to enter 1025)

*

This channel is only visible if you are logged in at the Sunny WebBox as "installer". To do this, 
follow the Sunny WebBox manual.

Содержание SCHOOLMETERBOX

Страница 1: ...System Monitoring SCHOOLMETERBOX AU Installation Guide SMETER IEN084710 98 00013210 Version 1 0 EN...

Страница 2: ......

Страница 3: ...on 8 4 2 Mounting the Schoolmeterbox on the Wall 8 4 3 Mounting the Schoolmeterbox onto a DIN Rail 9 5 Electrical Connection 11 5 1 Connection Area Overview 11 5 2 Connecting the Schoolmeterbox to the...

Страница 4: ...e 7 2 Care 16 8 Decommissioning 17 8 1 Dismounting the Schoolmeterbox 17 8 2 Packing the Schoolmeterbox 17 8 3 Disposal of the Schoolmeterbox 17 9 Troubleshooting 18 9 1 LED Overview 18 10 Channel Lis...

Страница 5: ...nstaller 1 3 Symbols Used The following types of warnings and general information appear in this document as described below DANGER DANGER indicates a hazardous situation which if not avoided will res...

Страница 6: ...fety Precautions Please follow all operating and safety precautions in this manual Failure to follow these instructions could result in damage to the device and cause personal injury DANGER Risk of le...

Страница 7: ...ype plate You can identify the Schoolmeterbox using the type plate on its underside Firmware and Hardware The firmware and hardware versions of the Schoolmeterbox are shown on the Sunny WebBox user in...

Страница 8: ...eterbox power supply plug requires a socket The maximal cable length of the RS485 bus cannot exceed 1 200 m The Schoolmeterbox can be mounted horizontally or vertically 4 2 Mounting the Schoolmeterbox...

Страница 9: ...een mounted 4 3 Mounting the Schoolmeterbox onto a DIN Rail Mounting accessories provided 1 Choose the mounting location as described in section 4 1 Mounting Location 8 2 Fix the clip onto the bracket...

Страница 10: ...ail as shown in the illustration The illustration shows a horizontal mounting 4 Mount the Schoolmeterbox onto the bracket as shown in the illustration The Schoolmeterbox has been mounted 5 How to remo...

Страница 11: ...rbox to the RS485 Communication Bus A Connection for the RS485 bus B Power connection for the power supply plug C Ready the Ready LED shows whether the device is being supplied with voltage D Pulse th...

Страница 12: ...t the leads to the four pole plug 7 Write down the colors of each wire 8 Introduce the plug found in the Schoolmeterbox into one of the terminals for the RS485 bus 9 Connect the other end of the cable...

Страница 13: ...RS485 bus 5 3 Terminating the RS485 Bus Terminating the Schoolmeterbox The Schoolmeterbox must only be terminated when it is placed at the end of the RS485 bus 1 Introduce the resistor included in the...

Страница 14: ...nnecting the Cable to the Plug 4 Connect the leads to the two pole plug 5 Write down the colors of each wire 6 Introduce the plug in the Schoolmeterbox into the S0 terminal 7 Connect the other end of...

Страница 15: ...channels are adjusted via the Sunny WebBox web interface To do this follow the Sunny WebBox manual The following Schoolmeterbox channels are adjustable The complete channel list is described in secti...

Страница 16: ...ck for external damage or dirt 7 2 Care NOTICE Damage to the device due to infiltration of liquids The Schoolmeterbox is not impermeable liquids should not be allowed to infiltrate To clean the device...

Страница 17: ...s at the end of a RS485 bus terminate the device which is now at the end of the RS485 bus instead of the Schoolmeterbox The Schoolmeterbox has been decommissioned 8 2 Packing the Schoolmeterbox When r...

Страница 18: ...tage is too low Check the supply voltage and the power supply plug Pulsating LED yellow Status Meaning Measure flashes Normal operation Counter impulses from the consumption meter are arriving None pe...

Страница 19: ...ue of this channel is always 0 To carry out a reset enter the value 1 and save it At this moment the Schoolmeterbox carries out a reset The value for the channel is set back to 0 s_FwVer Shows the fir...

Страница 20: ...ironmental conditions for operation Ambient temperature 20 C to 65 C Relative humidity 5 to 95 non condensing Enclosure Rating IP20 Elevation 0 m to 2000 m above mean sea level AMSL Ambient conditions...

Страница 21: ...ce Inverter serial number and type Sunny WebBox serial number and firmware Schoolmeterbox serial number and firmware Serial number and firmware version of the Sunny SensorBox RS485 Power Injector seri...

Страница 22: ...instructions contained in all documents relevant to the product Operating the product under incorrect safety or protection conditions Altering the product or supplied software without authority The p...

Страница 23: ......

Страница 24: ...SMA Solar Technology AG Sonnenallee 1 34266 Niestetal Germany Tel 49 561 9522 4000 Fax 49 561 9522 4040 E Mail Vertrieb SMA de Freecall 0800 SUNNYBOY Freecall 0800 78669269 www SMA de...

Отзывы: