3 Scope of Delivery
SMA Solar Technology AG
10
MC-BOX-12-3-20-BE-en-10
Operating Manual
3 Scope of Delivery
Check the scope of delivery for completeness and any externally visible damage. Contact your distributor if the scope of
delivery is incomplete or damaged.
Figure 2: Components included in the scope of delivery
Position
Quantity
Designation
A
1
Multicluster Box
B
1
Data cable for communication (5 m, black)
C
3
Data cable for measurement and control signals (5 m, red)
D
14
Cable clamp with counter sleeve (22 mm to 28 mm)
E
3
LV/HRC size 1 fuse link, 200 A
F
1
Set of non-woven adhesive labels for cable designation
G
4
Terminal incl. screws for connecting the protective conductors
H
3
Fuse link 1 A, tripping characteristics: gG
I
1
SD memory card with firmware version 3.5 or higher
K
1
Operating manual, circuitry overview, quick reference guide for the Sunny Island
inverter