
11 Sunny Portal
11.1 Registering the Cluster Controller in Sunny Portal
No combination of Cluster Controller and Sunny WebBox in one Sunny Portal
system
In a Sunny Portal system, the Cluster Controller must not be used in combination with the
Sunny WebBox.
• If there is already a Sunny WebBox in the Sunny Portal system where you want to
integrate the Cluster Controller, delete the Sunny WebBox from the Sunny Portal system
before registering the Cluster Controller (see user manual of the Cluster Controller in
Sunny Portal).
Procedure:
1. Select the Cluster Controller in the system tree and select the menu
Settings
in the device
menu.
2. If there is a proxy server in your LAN, make the proxy settings on the user interface of the
Cluster Controller (see Section 17.2, page 87). This ensures that the Cluster Controller can
establish a connection to Sunny Portal via the proxy server.
3. Select the parameter group
Sunny Portal > Basic settings
.
4. Select [
Edit
].
5. Activate data transmission to Sunny Portal. Select the entry
Yes
in the drop-down list
Use
Sunny Portal
.
6. Make the user settings in the group
User settings
:
• In the field
, enter the e-mail address to which Sunny Portal is to send the access
data.
☑ The system identifier is automatically entered in the field
ID of PV system
. Together
with the e-mail address and the system name, the system identifier is a unique
identifier of the system in Sunny Portal.
• In the field
PV system name
, enter the name under which the system is to be displayed
in Sunny Portal.
7. Select [
Save
].
8. Perform the registration in Sunny Portal. Select [
Execute
] in the field
Register
in the group
Status and Actions
.
☑ The Cluster Controller synchronizes the system time with Sunny Portal and carries out the
registration.
OK
is displayed in the field
Result of the last registration
and Sunny Portal
sends the access data to the specified e-mail address.
☑ The registration of the other devices in the system is performed automatically.
☑ The result of the registration attempt is logged in the event log (see Section 9.1, page 51).
✖ The registration has failed?
• Rectify the error (see Section 18.2, page 96).
11 Sunny Portal
SMA Solar Technology AG
User Manual
ClusterController-BA-en-15
56
Содержание CLUSTER CONTROLLER
Страница 1: ...User Manual SMA CLUSTER CONTROLLER ClusterController BA en 15 Version 1 5 ENGLISH...
Страница 113: ......
Страница 114: ...SMA Solar Technology www SMA Solar com...