Installation Checkout 

3.1  INTRODUCTION 

This section contains checkout procedures that will validate the installation and return to service of the 
SKY899 installed with a WX-1000/SKY497 display using TT391 Flightline Tester. Detailed setup, 
operation and maintenance information for the TT391 Flightline Tester is provided in the TT391 
Instruction Manual. 

CAUTION 

Each time the TRC, directional antenna, or directional antenna cables 
(including connectors) are installed, removed or replaced, the TRC must be 
calibrated to the directional antenna (refer to paragraphs 3.3.2 & 4.4.3). 

NOTES 

1.

 

This procedure assumes familiarity with the set up and operation of the 
TT391 Flightline Tester. 

2.

 

All test equipment used in completing these tests shall be calibrated in 
accordance with the manufacturer's recommendations. 

3.

 

This section provides checkout information for the SKY899 using the 
WX-1000 Display. If using an alternate display use Appendix F for 
installation checkout. 

4.

 

Checkout of the WX-1000 processor should be done in accordance 
with the procedures detailed in the WX-1000 Installation Manual. 

Table 3-1 lists the installation checkout procedures that should be used depending upon which display is 
installed and which tester is being used. 

 

Table 3-1: List of Installation Checkout Procedures 

Display 

Flightline Tester 

Installation Checkout 

Procedure 

WX-1000 Display 

TT-391 

Section 3 

 

TCAS-201 

Appendix C 

 

TIC T-49C 

Appendix D 

 

IFR-6000 

Appendix G 

Alternate Display 

TT-391 

Appendix F 

 

TCAS-201 

Appendix C 

 

TIC T-49C 

Appendix D 

 

IFR-6000 

Appendix G 

The document reference is online, please check the correspondence between the online documentation and the printed version.

Содержание SKY899

Страница 1: ... 2 All test equipment used in completing these tests shall be calibrated in accordance with the manufacturer s recommendations 3 This section provides checkout information for the SKY899 using the WX 1000 Display If using an alternate display use Appendix F for installation checkout 4 Checkout of the WX 1000 processor should be done in accordance with the procedures detailed in the WX 1000 Install...

Страница 2: ...a Traffic Advisory i e a solid circle at nm and Other Traffic i e open diamond at 4 5 nm Both targets will be displayed in level flight at own aircraft altitude i e 00 displayed above the traffic symbol If the indications given in the following procedure except for the Flightline Tester are not obtained refer to the troubleshooting procedures in Chapter 4 If indications given for the Flightline Te...

Страница 3: ...ge Calibration will be done during system setup verification and operation Figure 3 3 Standby Screen 3 3 1 System Setup The system configuration can be done using the service menu or it can be downloaded with a previously saved configuration using the Compact Flash Card Both setup procedures are described below and assume familiarity with service menu operation see chapter 4 for operation informat...

Страница 4: ...d at a comfortable level then select exit to return to setup menu 5 From the Setup menu select ARINC 429 ports and manually configure each receiver channel Refer to paragraph 4 4 1 4 NOTES 1 It is possible for multiple data inputs barometric altimeter radio altimeter magnetic heading and GPS navigation from one source to be received on one channel e g ARINC 429 superbus Multiple data inputs will b...

Страница 5: ...eturn to Service Menu e The Save or Revert menu will appear upon exiting setup menu Select Save Changes to keep current configuration Selecting Revert to Old Settings will cause system to exit the service menu without saving changes 7 To verify changes made to the configuration module turn the SKY899 OFF and then enter the Service Menu see paragraph 4 4 and repeat Step 6 8 Perform system setup ver...

Страница 6: ...h altitude and heading sensor Verify data monitors show the correct input changes i e sensing of these signals b If the information is not correct the sensor has failed to communicate with the TRC Check operation of the sensor and connections between the TRC and sensor c Select exit until you return to the Service Menu 4 From the Service Menu select Ground Test see paragraph 4 4 4 5 From the Groun...

Страница 7: ... to sub step f If the Flightline Tester AC Converter Power Supply is to be utilized proceed to sub step d d Connect the AC Converter Power Supply cable connector to the chassis external connector e Connect the AC Converter Power Supply input power cable connector to one of the following AC sources 115 Vac 60 Hz 115 Vac 400 Hz f Set the Flightline Tester POWER switches to the ON position g Verify t...

Страница 8: ...path distortion see step 1 3 During these tests the SKY899 may detect and display other active targets 4 To obtain a better line of sight it may be necessary to elevate the patch antenna d Set the TT391 POWER switch to the OFF Repeat procedure from each test point Step 15 can be done from the last test point NOTE To prevent SKYWATCH HP from tracking the movement of the test set it is necessary to ...

Страница 9: ...are cleared from the aircraft s instruments 2 Turn SKY899 ON The display should show a start up screen similar to one shown in Figure 3 2 3 After approximately thirty seconds observe the STANDBY screen and then press the TEST button soft key 2 4 The display should present a screen similar to that shown in Figure 3 5 Figure 3 5 Self Test Screen 5 If the SKY899 passes the self test the system will r...

Страница 10: ...be connected to P1 89 AUDIO_H 2 150 ohm audio systems should be connected to P1 90 AUDIO_L 3 Audio common is connected to P1 91 AUDIO_C NOTE Audio output from the TRC is transformer isolated 7 If SKY899 fails the self test a The SKY899 Failed screen with an error message indicating the type of failure will be displayed b The voice message SKYWATCH SYSTEM TEST FAILED will be enunciated over the coc...

Отзывы: