49
3.2 System Self-Test
The system will perform a “SELF
-
TEST” when the power is turned on or when the
TEST
button is
pressed during operation. This will verify the computer, display console, cables, and all remote sensors
are working properly.
During the “SELF
-
TEST,” all display functions are activated, allowing the operator to ensure all
indicators are functional.
NOTE:
It is important the indications shown during the Self-Test are recognized and understood by the
operator. This will aid in correctly determining computer and display communication problems.
For six seconds following “power on” or pressing the
TEST
button, the display will show the following
indications:
•
All display segments of the bar graph display (B) will be black (ON).
•
All display segments of the load, angle, radius, length, and rated capacity windows will be black
(ON), showing “188.8” or “888,800” for load and capacity.
•
All green configuration lamps will be illuminated.
•
The red LED indicators for overload and Anti Two-Block will be illuminated.
•
The yellow LED indicator for pre-warning will be illuminated.
•
The audible alarm will sound in the crane cab.
•
The display will now show the crane model/chart number and the units of measurement along
with the
message: “
SYSTEM SELF-
TEST IN PROGRESS.”
TEST
MAX
SET
CRANE
SETUP
SkyAzúl, Equipment Solutions
www.skyazul.com
301-371-6126