background image

 

 
 

Assembly and Operating Manual 

 

 

                 

 

 

                                     

       

 

 

 

 

Specification: 
*Length: 25-9/10"(655mm) 

   *Wing Span: 29-3/5"(750mm)                                

*Flying Weight: 15-9/10 oz (450g)

 

3D cap-232 

Содержание 3D cap-232

Страница 1: ...Assembly and Operating Manual Specification Length 25 9 10 655mm Wing Span 29 3 5 750mm Flying Weight 15 9 10 oz 450g 3D cap 232...

Страница 2: ...ystem is powered by the speed controller s integral BEC system Before you check the model s working systems set the control surfaces to neutral from the transmitter transmitter sticks and trims centra...

Страница 3: ...3 Fig 1 Tighten the control rod in horizon tail with screw Fig 2 Reverse the procedure to the right wing The photo shows the finished view Fig 3 Tighten the control rod in vertical tail with screw Fig...

Страница 4: ...4 Fig 5 Tighten the control rod in wing set with screw Fig 6 Photo shows the finished view Figs 7 Reverse the procedure to the left wing The photo shows the finished view Figs 8 Assemble the taildrag...

Страница 5: ...s 9 Assemble the taildraggers to the steering hole Figs 10 Apply glue to vertical tail Figs 11 Assemble the vertical tail and taildraggers to the fuselage Figs 12 Photo shows the vertical tail and tai...

Страница 6: ...l 3D cap 232 6 Figs 13 Apply glue to the fuselage Figs 14 Apply glue to the horizon tail Figs 15 Photo shows the horizon tail settled in the fuselage Figs 16 Connect the horizon tail pushrod cullet to...

Страница 7: ...se the procedure to the left side The photo shows the finished view Figs 18 Connect the vertical tail pushrod collet to control rod arm Figs 19 Photo shows the finished view Figs 20 Connect the wing p...

Страница 8: ...32 8 Figs 21 Connect the wing panel push rod to control rod arm Figs 22 Photo shows the finished view Figs 23 Reverse the procedure to the left wing The photo shows the finished view Figs 24 Assemble...

Страница 9: ...cap 232 9 Figs 25 Tight the fixup presser with screw Figs 26 Tight the plastic spinner with screw Figs 27 Fixed the propeller with screw Figs 28 Connect to the receiver and place the receiver in the m...

Страница 10: ...to shows battery leads connected to the speed controller Figs 31 32 Opening and closing the canopy The canopy is retained by the cowl at the front and by a tongue at the rear To open the canopy slide...

Страница 11: ...level ideally with the nose inclined slightly down Adjust the position of the flight battery if necessary Mark the battery location in the fuselage so that you can be confident of replacing it in the...

Страница 12: ...d aileron a should rise the left hand aileron b fall Pull the elevator stick back towards you c and the rear edge of both elevators should rise c If either control surface function works the wrong way...

Страница 13: ...irst few flights please wait for a day with no more than a gentle breeze A good flying site consists of a large flat open grassy field devoid of trees fences high tension overhead cables etc Repeat th...

Страница 14: ...32 Jiangyin Skyangel Electronic Technology Co Limited 5th Floor A3 Building Xinjianxing Technology Industrial Park Fengxin Road Guangming Town Bao an Shenzhen City 518107 China Phone 86 755 33699201 F...

Отзывы: