background image

GERMANY

5

6

6

2

1

1

T6

3

T6
max. 0,15Nm

4

Wärmequelle/Heat source

MANUAL 

¬ 

COM

/

PAD 

¬

 11756

ALLROAD

ROAD

MOUNTAIN

 

1. Prepare the COMPIT for the COM/PAD
  All COMPIT versions (except COMPIT/ANYWHERE)

1. Loosen and remove the levelling screws on both sides
2. Remove the docking station

4. Insert the sealing ring again. Attach the connection plate with the cable and 
4. secure it with screws. Do not exceed the 0.15 Nm tightening torque of the 
screws.

5. Insert the docking station between the retaining clamps.
6. Insert the levelling screws and tighten them slightly. Adjust the angle of the 
docking station. Tighten the levelling screws.

3-4. Loosen and remove the screws (T6). Remove and discard the dummy cover.

2. Connect the COMPIT to the e-bike

For e-bikes with a 12 V-36 V lighting system or power supply

Route the COMPIT connection cable to the motor, ensuring that the cable is 

routed cleanly along the cable routing specific to the bicycle model.

Connect the COMPIT connection cable to the cable of the lighting system with 
waterproof terminals at a suitable point. Alternatively, solder connections can also 
be used. Motor 

(connection cable is not supplied)

Содержание COM/PAD

Страница 1: ...ween the retaining clamps 6 Insert the levelling screws and tighten them slightly Adjust the angle of the docking station Tighten the levelling screws 3 4 Loosen and remove the screws T6 Remove and discard the dummy cover 2 Connect the COMPIT to the e bike For e bikes with a 12 V 36 V lighting system or power supply Route the COMPIT connection cable to the motor ensuring that the cable is routed c...

Страница 2: ...Gen 4 Light connection or 12 V aux BAFANG M620 7015 BS 2 12V 12W Fazua JST VSLE 03R connector 12 V Shimano screw terminals Light connection 12 V Brose S Front light connection 12 V Panasonic Light connection max 36 V 3 Attach the COM PAD Place the COM PAD on the COMPIT and turn it about 45 either to the right or left above the docking station until you hear it click into place OPTIONAL Screw in th...

Страница 3: ... COM PAD 11756 ALLROAD ROAD MOUNTAIN 4 Activate the COM PAD Switch on the e bike 5 Charge the mobile device wirelessly 1 Switch on the COM PAD LED indicator lights up blue 2 Attach the mobile device and lock it by turning it 3 Mobile device is charged and LED indicator flashes blue ...

Страница 4: ... Charge the mobile device with cable 1 Switch on the COM PAD USB C PD output LED indicator is off 2 Connect the cable not supplied to the COM PAD 3 Attach the mobile device and lock it by turning it 4 Connect the cable not supplied to the mobile device The mobile device is charging ...

Отзывы: