GERMANY
5
6
6
2
1
1
T6
3
T6
max. 0,15Nm
4
Wärmequelle/Heat source
MANUAL
¬
COM
/
PAD
¬
11756
ALLROAD
ROAD
MOUNTAIN
1. Prepare the COMPIT for the COM/PAD
All COMPIT versions (except COMPIT/ANYWHERE)
1. Loosen and remove the levelling screws on both sides
2. Remove the docking station
4. Insert the sealing ring again. Attach the connection plate with the cable and
4. secure it with screws. Do not exceed the 0.15 Nm tightening torque of the
screws.
5. Insert the docking station between the retaining clamps.
6. Insert the levelling screws and tighten them slightly. Adjust the angle of the
docking station. Tighten the levelling screws.
3-4. Loosen and remove the screws (T6). Remove and discard the dummy cover.
2. Connect the COMPIT to the e-bike
For e-bikes with a 12 V-36 V lighting system or power supply
Route the COMPIT connection cable to the motor, ensuring that the cable is
routed cleanly along the cable routing specific to the bicycle model.
Connect the COMPIT connection cable to the cable of the lighting system with
waterproof terminals at a suitable point. Alternatively, solder connections can also
be used. Motor
(connection cable is not supplied)