17
SKANDIA ELEVATOR – SEH 50/18, 50/23 & 63/30
Explosion relief panels
!
WARNING! & IMPORTANT!
If the elevator shall be equipped with explosion relief panels, fit the
explosion relief panels in the associated legs and the end of the
elevator head. Align the first pair of legs with explosion relief panels
directly against the elevator boot and the others with a maximum of 6
metres spacing. Fit the dust curtain with explosion relief panel in the
head. Use only explosion relief panels supplied by Skandia Elevator.
!
WARNING!
• Never stand in front of an explosion relief panel while the elevator is in
operation.
• All electrical equipment is to be connected by a qualified electrician.
See separate connecting directions for electronics.
M10x20