background image

                                               

  USER MANUAL

 

 

EtherTRAK

 

Redundant 

Ethernet

 

I/O Gateway 

 

Installation and Maintenance 

  Contents  at  a  Glance:  

Section 1 

General Information 

Section 2 

Assembly and Installation  

Section 3 

Power & ST-BUS Wiring 

Section 4 

Communications 

12 

Section 5 

Configuring the ET-GT-ST-3 

16 

Section 6 

Service Information 

28 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 

 
This manual applies to the following products:

 

EtherTRAK Redundant Ethernet I/O Gateway (ET-GT-ST-3) 

EtherTRAK Redundant I/O Gateway User Manual 

Page 1 of 16 

 

 

Last Revised: 8/17/2009 

SixnetTechnology Park 

 331 Ushers Road 

 Clifton Park, NY 12065  

 USA 

 1.518.877.5173 

 FAX 1.518.877.8346 

 [email protected]

 

Содержание EtherTRAK ET-GT-ST-3

Страница 1: ...ng 9 Section 4 Communications 12 Section 5 Configuring the ET GT ST 3 16 Section 6 Service Information 28 This manual applies to the following products EtherTRAK Redundant Ethernet I O Gateway ET GT S...

Страница 2: ...avors to improve the features and performance of software associated with its products no effort on the part of Sixnet to investigate improve or modify Sixnet software at the request of a customer wil...

Страница 3: ...ependent Ethernet network ports This allows you to have redundant Ethernet links to ensure that a simple cable failure will not cause you to lose your I O The ET GT ST 3 can also be used in conjunctio...

Страница 4: ...ed tools you need for every step of your project from the initial specification through startup and years of trouble free operation Configuration information flows between Sixnet Windows saving you ti...

Страница 5: ...ny peripheral equipment Refer to the appropriate user manuals for I O connection details Install Communication Cabling Install the appropriate Ethernet and or RS232 cabling between the Sixnet equipmen...

Страница 6: ...d and write all your I O Note Set tag name restrictions in the Sixnet I O Tool Kit program before creating tag names to ensure compatibility when exporting them for usage in other Windows applications...

Страница 7: ...DIN rail mounted components such as terminal blocks and fuse holders End clamps are recommended to restrict side to side movement Figure 2 2 shows the physical dimensions of the units covered by this...

Страница 8: ...ST 3 Side View 4 27 10 83 cm 4 47 11 35 cm 2 92 7 42 cm 3 17 8 05 cm 4 27 10 83 cm 1 38 3 5 cm 1 06 2 7 cm 0 30 0 76 cm DIN EN50022 not included with units not shown to scale for reference only ET GT...

Страница 9: ...s and more DC GND DC IN DC GND DC GND DC GND DC GND DC GND DC GND DC GND DC GND DC OUT DC OUT DC OUT DC OUT DC OUT DC OUT DC OUT DC OUT Chassis DC GND DC GND DC OUT DC OUT DC GND DC IN Line Line Neutr...

Страница 10: ...dundant I O Gateway 20 any mix Required cable type Any with 2 individually shielded pairs 22AWG min Recommended cables Alpha 2466C Belden 8723 Carol C1352 Max cabling off each EtherTRAK Redundant I O...

Страница 11: ...d should be tied to the metal connector body at one end of the cable only Note The Sixnet RJ45 port pinouts are EIA TIA 561 compliant RJ45 Pin Locations for RS232 or Ethernet Typical PC Adapter Wiring...

Страница 12: ...etails Use data quality not voice quality twisted pair cable rated category 5 with standard RJ45 connectors For best performance use shielded cable Please note that these cables are available as strai...

Страница 13: ...4 Once you ve completed the wizard save your project file Go to the Device menu and choose Serial Port for the communication device Then go to the Operations menu and select Load This should set the...

Страница 14: ...and then define I O Transfers to your slave stations Refer to the I O Tool Kit on line help for details on configuring I O Transfers Master to Master Mode This advanced mode allows two master devices...

Страница 15: ...loaded from the I O Tool Kit software SLOW or PERODIC BLINK This indicates that the internal watchdog has detected a problem Try clearing the memory and reloading the project from the I O Tool Kit Mem...

Страница 16: ...ot be billed if the repair is covered under warranty Please supply us with as many details about the problem as you can The information you supply will be written on the RMA form and supplied to the r...

Отзывы: