SITECO Connect 31 Gen2 Commissioning Instruction V1.0 262639-002
4.5
Connect the Controller to a construction area
Now add the controller to construction area.
The prerequisite is that the controller has not yet been added to a network / area.
The red "Status" LED on the controller must therefore light up red continuously.
If the "Status" LED lights up green on the controller, this has already been added to another area / network.
You can only insert this into the meeting room by deleting it.
Please set the following in the app:
The controller is now automatically inserted into the construction area. This can take up to a minute.
Содержание Connect 31
Страница 8: ...7 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 ...
Страница 22: ...21 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 5 2 Wiring Luminaires B ...
Страница 25: ...24 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 6 2 Delete components ...
Страница 26: ...25 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 6 3 Delete area ...
Страница 27: ...26 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 6 4 Delete network ...
Страница 28: ...27 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 6 5 Firmware current update ...
Страница 32: ...31 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 ...